Laserfiche WebLink
HWA <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE - EXTRA WORK SUPPLEMENT # 2 <br /> Classification Total Hours X Rate = Cost <br /> Principle IX 2.00 X $72.00 = $144.00 <br /> Principle VIII 9.00 X $72.00 = $648.00 <br /> Geotec Eng VI 7.00 X $48.08 = $336.56 <br /> Geotch Eng IV 6.00 X $45.67 = $274.02 <br /> Geologist 1.00 X $35.48 = $35.48 <br /> Hydrologist 4.00 X $34.62 = $138.48 <br /> CAD 0.00 X $22.07 = $0.00 <br /> Clerical 0.00 X $20.82 = $0.00 <br /> DSC Subtotal $1,576.54 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 175.00% X $1,576.54 = $2,758.95 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $1,576.54 = $472.96 <br /> Reimbursables <br /> Mileage (## Miles x $0.565/mile) <br /> Reprographics (## Sheets x $X.xx/sheet) <br /> Subcontract (Sub Name & Task) <br /> (Blank) (Allowance) <br /> Subtotal $0.00 <br /> Subconsultant Total: $4,808.45 <br />