Laserfiche WebLink
10/3/2016 <br /> COST ESTIMATE: GRAND AVENUE PARK BRIDGE-EXTRA WORK SUPPLEMENT#2 <br /> October 3,2016 HWA Geotechnical HWA <br /> GRAND AVENUE PARK BRIDGE - EXTRA Principle IX Principle GeotecEng GeotchEng Geologist Hydrologist CAD Clerical <br /> WORK SUPPLEMENT#2 vii, vl Iv <br /> MULTIPLIER: <br /> Item SCOPE OF WORK S72.00 $72.00 $48 08 $45.67 $35 48 $34 62 $22.07 $20.82 3.0500 <br /> 1 PROJECT MANAGEMENT <br /> 0 0 0 0 0 0 0 0 $0 <br /> 2 GEOTECHNICAL ENGINEERING <br /> 2.10 Extra Work-Slope Stability Evaluatons $425 <br /> 2.20 Extra Work-Ground Water Monitoring 1 2 $1,029 <br /> Extra Work-Additional Plan and Spec Review 2 8 6 2 $3,354 <br /> 2 9 7 6 1 4 0 0 $4,808 <br /> Y, <br /> 3 STRUCTURAL ENGINEERING <br /> Labor Subtotal: 0 00 0 0 0 0 $0 <br /> 4 CIVIL ENGINEERING <br /> 111 0 0 0 0 0 0 0 0 $0 <br /> Reilrlb <br /> 5 ENVIRONMENTAL 8 PERMITTING <br /> Labor Subtotal: 0 0 0 0 0 0 0 $0 <br /> 6 ELECTRICAL ENGINEERING <br /> ... 0 6 0 0 0 0 0 0 $0 <br /> b <br /> Reimursabtes `p <br /> Labor Sum: 2 9 7 6 1 4 0 0 $4,808 <br /> Reimbursable Sum: $0 <br /> HWA SUBTOTAL: $4,808 <br />