EXHIBIT A <br /> SCOPE OF WORK <br /> Grand Avenue Park Bridge <br /> Construction Management and Construction Support <br /> SUPPLEMENT 3 <br /> November 28, 2016 <br /> PROJECT DESCRIPTION <br /> KPFF Consulting Engineers (KPFF) has an agreement with the City of Everett (City)to complete the <br /> Plans, Specifications and Cost Estimate (PS&E), and Construction Management (CM) including full <br /> Construction Support (CS) services for the Grand Avenue Park Bridge. <br /> The PS&E (design Phases 1 & 2) is complete and was delivered for final WSDOT review in September <br /> 2016. Supplement 3 is for the CM and CS (Construction) phase of the project only and addresses the <br /> cost of using the KPFF design and construction team to provide CM and CS services through the <br /> completion of construction. Construction involves building a combined utility and pedestrian bridge from <br /> Grand Ave Park, spanning the BNSF railway right of way and SR 529 (West Marine View Drive) and <br /> terminating just west of MVD on Port of Everett right of way. This effort includes the installation of 3 Utility <br /> lines extending from Grand Avenue at the north end of Grand Avenue Park to the bridge, across the <br /> bridge, down the west Abutment shaft, and then into Marine View Drive (MVD) and finally extending north <br /> of the bridge along MVD for about 50 feet, at which point all utility lines will be capped. The utility pipes <br /> (CS, SD, and FM)will be connected to extend to PS03 and further along MVD as detailed in a separate <br /> construction bid document developed as Phase 2 PS&E. Supplement 3 includes Construction Support <br /> for both Phase l&2 construction. It does not include CM services for Phase 2 construction <br /> PROJECT OBJECTIVES <br /> This scope of work details Construction Support(CS)and Construction Management (CM)for the <br /> construction of the Grand Avenue Park Bridge. CM will be performed in conformance with the common <br /> WSDOT Construction Documentation practices for Local Agencies including applicable chapters of the <br /> LAG Manual (particularly Chapters 52 and 53), and in conformance with applicable sections of the <br /> WSDOT Standard Specifications (M41-10), 2016, and the WSDOT Construction Manual (M41-01.25, <br /> April 2016)which provides construction engineering personnel instruction for fulfilling the objectives, <br /> procedures, and methods for construction administration of federally funded projects. <br /> CS will be on an as-needed/on-call basis. The need of the work will be established and caused by the <br /> Resident Engineer(RE) or the Owner Project Manager (PM)for Construction or a direct agent of either <br /> the RE or the Owner PM. The RE or PM will contact the KPFF Project Manager (Tom Whiteman)to <br /> request the services. The KPFF Manager will arrange the services with the required design team <br /> member(s) and provide direction and schedule as required per the work request. <br /> The scope of work is expected to last approximately 16 months following the Notice to Proceed. The <br /> budget allocated may be used for either phase of work as needed based on the actual amount the CM <br /> and CS team are caused to work per requests from the CM team, with the City's concurrence. <br /> lgff <br /> 1 of 15 <br />