My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 12/27/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
KPFF Consulting Engineers 12/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 3:45:04 PM
Creation date
2/15/2017 3:44:40 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
12/27/2016
Council Approval Date
12/21/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Ave Bridge
Tracking Number
0000436
Total Compensation
$1,390,791.35
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• COST ESTIMATE:GRAND AVENUE PARK BRIDGE-CONSTRUCTION MANAGEMENT CSS <br /> PHASE 2 (assume 6 months) <br /> November 28,2016 H W A GeoSciences Inc. EWA <br /> GRAND AV E N U E PARK BRIDGE PrInopal IX Pdnclpd Geotech. .HYdrogeningiEt vI Geoteca. Geolech. Geologist V Clerical <br /> CONSTRUCTION MANAGEMENT & CSS VIII Engines VI Engines 111 Engines l <br /> MULTIPLIER'. <br /> item , SCOPE OF WORK $82.93 $74.04 $52.58 $40.00 $37.02 $32.69 $32.69 $21.25 3.1840 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal: 0 0 I 0 0 0 0 0 0 1 $0 <br /> Reimbursables: <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT _ <br /> Labor Subtotal. 0 0 0 0 0 0 0 0 50 <br /> Reimbursable*: <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> 3.10 Geotechnical Construction Engineering <br /> 3.11 Preconstruction Meeting(not required) 0 4 $471 <br /> 3.12 Geotechnical Submittal Review(on-call) 4 8 .. $1,616 <br /> 3.13 Geotechnical Construction Consultation(as needed) 3 16 0 $3,486 <br /> 3.14 Dewatering Rate Review(Phase 1 is sufficient) 0 4 0 $673 <br /> 3.20 Geotechnical Observation and Associated Field Engineering <br /> 3.21 Utility Excavation&Shoring(City will handle) 4 0 0 $673 <br /> 3.22 Installation of Slope Protection System(10 days)(Not required) 0 0 0 <br /> 3.23 Sheetpile Installation(Inspectors to handle) 0 0 0 <br /> 3.24 Construction Meetings(assume 0 meetings) 4 $673 <br /> 3.25 <br /> 3.30 Project Management <br /> 3.21 OA,Budget Tracking,Communications,Scheduling,Billing 2.5 0 6 $827 <br /> Labor Subtotal. 3 0 34.5 0 12 0 0 6 $8,421 <br /> >'Reimbursable*: <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal 0 0 0 0 0 0 0 0 $0 <br /> Reimbursables: <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 50 <br /> Reimbursables: <br /> 6 COMBINED SEWER&STORMWATER SUPPORT <br /> Labor Subtotal: 0 0 0 0 o 5 5 0 $0 <br /> Reimbursables: <br /> 7 ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 50 <br /> Reimbursables: <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 $0 <br /> Reimbursables. <br /> 9 _LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal: o 0 0 0 0 0 00 50 <br /> Reimbursables: <br /> 10 ENVIRONMENTAL SERVICES _ <br /> Labor Subtotal.: 0 0 0 0 0 D 0 0 00 <br /> Reimbursables: <br /> 11 ELEVATOR DESIGN SUPPORT _ <br /> Labor Subtotal. 0 0 0 0 0 0 0 0 so <br /> Reimbursables: <br /> 12 MECHANICAL SUPPORT _ <br /> Labor Subtotal: 0 ' ' 0 1___ o 0 0___- o50 <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 $0 <br /> Labor Sum: 3 0 34.5 ' 0 I 12 0 0 6 $8,421 <br /> Reimbursable Sum: $0 <br /> IHWA SUBTOTAL: $8,421 <br />
The URL can be used to link to this page
Your browser does not support the video tag.