Laserfiche WebLink
COST ESTIMATE: GRAND AVENUE PARK BRIDGE-CONSTRUCTION MANAGEMENT CSS <br /> PHASE 1 (assume 16 months) <br /> November 22,2016 KBA Construction Management 8 Observation KBA <br /> GRAND AVENUE PARK BRIDGE- Project Resident Office Project Contract <br /> CONSTRUCTION MANAGEMENT& CSS Principal Manager Engineer Engineer Inspector Admin. Admin. <br /> MULTIPLIER <br /> Item SCOPE OF WORK <br /> $85.32 j $60.35 $60.85 $43.70 I $47.87 f $92.76 I $52.03 2.7015 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal: 0 0 0 00 0 0 $0 <br /> 2 TOPOGRAPHIC 8 BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 $o <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 $0 <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 $0 <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 $0 <br /> 6 COMBINED SEWER&STORMWATER SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 11 SO <br /> 7 ARCHITECTURE 8 BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal: 0 0 0 0__ 0.__ 0 0 11 S0 <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 50 <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal: 0 0 0 0 00 0 50 <br /> 10 ENVIRONMENTAL SERVICES <br /> Labor Subtotal: 0 0 0 0 00 0 II So <br /> 11 ELEVATOR DESIGN SUPPORT +ul <br /> Labor Subtotal: 0 0 0 0 00 0 II $0 <br /> 12 MECHANICAL SUPPORT J{il <br /> Labor Subtotal: 0 0 0 0 00 0. _ SO <br /> {ul <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> 13.10 Construction Management Services 17 480 2832 1896 42 $744,847 <br /> Labor Subtotal: 17 280 2832 1896 00 42 $744,847 <br /> $103,894 <br /> Labor Sum: 17 280 2832 1896 0 0 42 $744,847 <br /> Reimbursable Sum: $103,894 <br /> KBA $848,741 <br />