My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 12/27/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
KPFF Consulting Engineers 12/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 3:45:04 PM
Creation date
2/15/2017 3:44:40 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
12/27/2016
Council Approval Date
12/21/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Ave Bridge
Tracking Number
0000436
Total Compensation
$1,390,791.35
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE: GRAND AVENUE PARK BRIDGE-CONSTRUCTION MANAGEMENT CSS <br /> PHASE 1 (assume 16 months) <br /> November 22,2016 KBA Construction Management 8 Observation KBA <br /> GRAND AVENUE PARK BRIDGE- Project Resident Office Project Contract <br /> CONSTRUCTION MANAGEMENT& CSS Principal Manager Engineer Engineer Inspector Admin. Admin. <br /> MULTIPLIER <br /> Item SCOPE OF WORK <br /> $85.32 j $60.35 $60.85 $43.70 I $47.87 f $92.76 I $52.03 2.7015 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal: 0 0 0 00 0 0 $0 <br /> 2 TOPOGRAPHIC 8 BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 $o <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 $0 <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 $0 <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 $0 <br /> 6 COMBINED SEWER&STORMWATER SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 11 SO <br /> 7 ARCHITECTURE 8 BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal: 0 0 0 0__ 0.__ 0 0 11 S0 <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 00 0 0 50 <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal: 0 0 0 0 00 0 50 <br /> 10 ENVIRONMENTAL SERVICES <br /> Labor Subtotal: 0 0 0 0 00 0 II So <br /> 11 ELEVATOR DESIGN SUPPORT +ul <br /> Labor Subtotal: 0 0 0 0 00 0 II $0 <br /> 12 MECHANICAL SUPPORT J{il <br /> Labor Subtotal: 0 0 0 0 00 0. _ SO <br /> {ul <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> 13.10 Construction Management Services 17 480 2832 1896 42 $744,847 <br /> Labor Subtotal: 17 280 2832 1896 00 42 $744,847 <br /> $103,894 <br /> Labor Sum: 17 280 2832 1896 0 0 42 $744,847 <br /> Reimbursable Sum: $103,894 <br /> KBA $848,741 <br />
The URL can be used to link to this page
Your browser does not support the video tag.