Laserfiche WebLink
COST ESTIMATE: GRAND AVENUE PARK BRIDGE-CONSTRUCTION MANAGEMENT CSS <br /> PHASE 1 (assume 16 months) <br /> November 22,2016 Landau Associates Landau <br /> GRAND AVENUE PARK BRIDGE- <br /> Senor gssociate Senior Staff/Senior Project CAD/GIS Support StaffCONSTRUCTION MANAGEMENT&CSS Associate Tech II Coordinator Tech <br /> MULTIPLIER. <br /> [tern SCOPE OF WORK $60.53 $45.87 544 71 $27.74 I $32.97 $33.08 $23.43 3.3407 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal: 0 0 0 0 0 0 0 90 <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal'. 0 0 0 00 0 0 $0 <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 5o <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 $0 <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 $0 <br /> 6 COMBINED SEWER&STORMWATER SUPPORT I <br /> Labor Subtotal. 0 0 0 0 0 0 0 $0 <br /> 7 ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 $0 <br /> '' R.bnburaebl.se j <br /> 6 ELECTRICAL ENGINEERING SUPPORT I <br /> Labor Subtotal: 0 0 0 0 0 0 0 II So <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT II <br /> Labor Subtotal: 0 0 0 0 0 0 0 $0 <br /> 10 ENVIRONMENTAL SERVICES <br /> 10.10 Sampling of Stockpiled Soil from Area of Known Potential 1 2 8 2 1 $1,549 <br /> Contamination <br /> Labor Subtotal: 1 2 0 8 2 0 I $1,549 <br /> $2,462 <br /> 11 ELEVATOR DESIGN SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 $0 <br /> tt <br /> 12 MECHANICAL SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 ' $0 <br /> 13 CONSTRUCTION MANAGEMENT SERVICES I'll <br /> Labor Subtotal, 0 0 0 0 0 i 0 0 $0 <br /> Labor Sum: 1 2 0 8 2 0 1 $1,549 <br /> Reimbursable Sum: $2,462 <br /> Landau $4,010 <br />