My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 12/27/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
KPFF Consulting Engineers 12/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 3:45:04 PM
Creation date
2/15/2017 3:44:40 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
12/27/2016
Council Approval Date
12/21/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Ave Bridge
Tracking Number
0000436
Total Compensation
$1,390,791.35
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE: GRAND AVENUE PARK BRIDGE-CONSTRUCTION MANAGEMENT CSS <br /> PHASE 2 (assume 6 months) <br /> November 22,2016 Landau Associates Landau <br /> GRAND AVENUE PARK BRIDGE- Senior staff/Senior Project CAD/GIS <br /> CONSTRUCTION MANAGEMENT&CSS Associate Senior Support Staff <br /> Associate I Tech II Coordinator Tech <br /> I MULTIPLIERS. <br /> Item SCOPE OF WORK 560.53 $45.87 $44.71 $27.74 $32.97 $33.08 $23.43 I 3.3407 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal: 0 0 0 00 0 0 S0 <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 $0 <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 00 <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 l 0 0 --_ 0 0 0 0 $0 <br /> $ CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 90 <br /> 6 COMBINED SEWER&STORM WATER SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 II SO <br /> 7 ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal:— 0 0 0 0 0 0 0 $0 <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 SO <br /> ticaf ui• <br /> ift <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 $0 <br /> 10 ENVIRONMENTAL SERVICES <br /> 10.10 Sampling of Stockpiled Soil from Area of Known Potential I ,, $1,549 <br /> Contamination <br /> Labor Subtotal: 1 2 0 0 2 0 1 $1,549 <br /> 11 ELEVATOR DESIGN SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 50 <br /> 12 MECHANICAL SUPPORT <br /> Labor Subtotal: 0 0 0 0 0 0 0 $0 <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> Labor Subtotal 0 1 0 0 0 0 0 0 50 <br /> Labor Sum: 1 2 0 8 2 0 1 $1,549 <br /> Reimbursable Sum: $0 <br /> !Landau $1,549 <br />
The URL can be used to link to this page
Your browser does not support the video tag.