Laserfiche WebLink
COST ESTIMATE: GRAND AVENUE PARK BRIDGE -CONSTRUCTION MANAGEMENT CSS <br /> PHASE 1 (assume 16 months) <br /> November 22,2016 LMN Architects LMN <br /> GRAND AVENUE PARK BRIDGE - <br /> Partner Project Designer Specs <br /> CONSTRUCTION MANAGEMENT & CSS MULTIPLIER <br /> Item SCOPE OF WORK $77 88 $34.86 $45.91 3.1500 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal: 0 0 0 $0 <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 I $0 <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> 6 COMBINED SEWER&STORM WATER SUPPORT <br /> Labor Subtotal: 0 0 0 I $0 <br /> 7 ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> 7.10 Architectural Construction Support Services 10 I 120 I 8 $16,787 <br /> Labor Subtotal: 10 120 8 II $16,787 <br /> $164 <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 00 $0 <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> 10 ENVIRONMENTAL SERVICES <br /> Labor Subtotal: 0 0 0 $0 <br /> 11 ELEVATOR DESIGN SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> 12 MECHANICAL SUPPORT <br /> Labor Subtotal: 0 0 0 SO <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> Labor Subtotal: 0 0 0 $0 <br /> Labor Sum: 10 120 8 $16,787 <br /> Reimbursable Sum: $164 <br /> $16,951 <br />