Laserfiche WebLink
EXHIBIT G-1 <br /> LMN Architects <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE - CONSTRUCTION MANAGEMENT & CSS <br /> PHASE 1 <br /> Classification Total Hours X Rate = Cost <br /> Partner 10 X $77.88 = $778.80 <br /> Project Designer 120 X $34.86 = $4,183.20 <br /> Specs 8 X $45.91 = $367.28 <br /> X _ $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> DSC Subtotal $5,329.28 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 185.00% X $5,329.28 = $9,859.17 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $5,329.28 = $1,598.78 <br /> Total LMN Labor Cost $16,787.23 <br /> Reimbursables <br /> Mileage (300 Miles x $0.545/mile) $163.50 <br /> Subtotal $163.50 <br /> Subconsultant Total: $16,950.73 <br /> 11/18/2016 1<1ff <br />