My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 12/27/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
KPFF Consulting Engineers 12/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 3:45:04 PM
Creation date
2/15/2017 3:44:40 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
12/27/2016
Council Approval Date
12/21/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Ave Bridge
Tracking Number
0000436
Total Compensation
$1,390,791.35
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE: GRAND AVENUE PARK BRIDGE - CONSTRUCTION MANAGEMENT CSS <br /> PHASE 1 (assume 16 months) <br /> November 22,2016 Stantec Consulting Services Inc. Stantec <br /> GRAND AVENUE PARK BRIDGE - Project <br /> CONSTRUCTION MANAGEMENT & CSS Manager Designer Production <br /> MULTIPLIER: <br /> Item SCOPE OF WORK $170.00 $142.00 $98.00 1.3000 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal: 0 0 0 $0 <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal: 0 0 0 I $0 <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 50 <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> 6 COMBINED SEWER&STORMWATER SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> 7 ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> 8.10 Bidding Support <br /> 8.11 Answer Bidding Questions 2 $442 <br /> 8.12 Prepare One Addendum 4 2 2 $1,508 <br /> 8.20 Constructabllity Review <br /> 8.21 Attend Pre-Con 4 $884 <br /> 8.22 Review Submittals 4 4 $1,622 <br /> 8.23 Answer Contractor Questions\RFI 6 6 $2,434 <br /> 8.24 Prepare\Review Contract Change Orders 6 6 $2,434 <br /> 8.30 Electrical Construction Support Services _ <br /> 8.31 Construction Observation Visits(6) 12 6 $3,760 <br /> 8.32 Lighting Focusing Review and Observation 6 $1,326 <br /> 8.33 Punch List 5 $1,105 <br /> 8.34 Project Closeout&Record Drawings 2 2 2 $1,066 <br /> Labor Subtotal: 51 26 4 $16,580 <br /> - f <br /> $65 <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> 10 ENVIRONMENTAL SERVICES <br /> Labor Subtotal: 0 00 II $0 <br /> 11 ELEVATOR DESIGN SUPPORT <br /> Labor Subtotal: 0 0 0 $0 <br /> Reimbut'_, , <br /> 12 MECHANICAL SUPPORT <br /> Labor Subtotal: 0 0 0 SO <br /> a <br /> -� ,.. ,,� ..�.� ...sus .u.,. �..., � ,Re1p►blA1'fiAb1eQ; . .,M�.�.-k a <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> Labor Subtotal: 0 0 0 $0 <br /> Labor Sum: 51 26 4 $16,580 <br /> Reimbursable Sum: $65 <br /> $16,646 <br />
The URL can be used to link to this page
Your browser does not support the video tag.