Laserfiche WebLink
EXHIBIT G-1 <br /> Tres West Engineers, Inc. <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE - CONSTRUCTION MANAGEMENT & CSS <br /> PHASE 1 <br /> Classification Total Hours X Rate = Cost <br /> Principal 48 X $52.00 = $2,496.00 <br /> Project Manager 40 X 'i $39.66 = $1,586.40 <br /> Designer 40 X $30.00 = $1,200.00 <br /> Administration 24 X "' $27.00 = $648.00 <br /> X _ _ $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> DSC Subtotal $5,930.40 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 121.75% X $5,930.40 = $7,220.26 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $5,930.40 = $1 ,779.12 <br /> Total Tres West Engineers Labor Cost $14,929.78 <br /> Reimbursables <br /> Mileage (300 Miles x $0.545/mile) $163.50 <br /> Subtotal $163.50 <br /> Subconsultant Total: $15,093.28 <br /> 11/18/2016 <br />