Laserfiche WebLink
COST ESTIMATE: GRAND AVENUE PARK BRIDGE -CONSTRUCTION MANAGEMENT CSS <br /> PHASE 1 (assume 16 months) <br /> November 22,2016 Tres West Engineers,Inc. Tres West <br /> GRAND AVENUE PARK BRIDGE - Project <br /> CONSTRUCTION MANAGEMENT & CSS PrincipallManager Designer Administration <br /> MULTIPLIER: <br /> Item SCOPE OF WORK $52.00 $39.66 j $30.00 1 $27.00 r 2.5175 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal: 0 0 0 0 I SO <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> tabor Subtotal: 0 0 0 0 SO <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 6 COMBINED SEWER&STORM WATER SUPPORT <br /> Labor Subtotal: 0 0 0 0 SO <br /> 7 ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal: 0 0 0 0 SO <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal:— 0 0 0 0 $0 <br /> 10 ENVIRONMENTAL SERVICES <br /> � <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 11 ELEVATOR DESIGN SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 12 MECHANICAL SUPPORT <br /> 12.10 Mechanical Construction Support Services 48 I 40 40 24 $14,930 <br /> 1 <br /> 1 <br /> Labor Subtotal: 48 40 40 24 $14,930 <br /> $164 <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> Labor Subtotal: 0 0 i 0 1 0 $0 <br /> Labor Sum: 48 40 40 24 $14,930 <br /> Reimbursable Sum: $164 <br /> $15,093 <br />