Laserfiche WebLink
Grand Avenue Park Bridge Construction Management and Construction Support <br /> City of Everett Scope of Work <br /> Exhibit A <br /> 5.10—Construction meetings <br /> • Preconstruction meeting <br /> • Field observation visits (assume 4)with observation reports <br /> • Update Civil design based on field visits <br /> 5.20—Office time support <br /> • Engineer Shop Drawing review <br /> • Review& approval of RFIs and materials submittals <br /> • Technical engineering support <br /> 6. COMBINED SEWER & STORMWATER SUPPORT <br /> There is no Sewer& Stormwater Support needed for this phase of construction. <br /> 7. ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> LMN will provide architectural services as needed. LMN will perform shop drawing review and other <br /> requested services, including reviews related to the bridge railing and other items as requested by KPFF. <br /> These requests will be related to their original design responsibilities, and related to the information <br /> depicted in the architecture plans and related specs. <br /> 8. ELECTRICAL ENGINEERING SUPPORT <br /> Stantec will provide the following electrical engineering support as needed: <br /> 8.10—Bidding Support <br /> • Answer bidding questions <br /> • Prepare one (1) addendum <br /> 8.20—Constructability Review <br /> • Pre-construction meeting <br /> • Review submittals <br /> • Answer contractor questions/RFIs <br /> • Prepare/Review contract change orders <br /> 8.30— Electrical Construction Support Services <br /> • Construction observation visits (6) <br /> • Lighting focusing review and observation <br /> • Punch list <br /> • Project closeout& record drawings <br /> 9. LANDSCAPE ARCHITECTURE& IRRIGATION SUPPORT <br /> The City of Everett will provide landscape architectural services for this phase of the project and will <br /> therefore not be included in the team fee estimate. Their duties are expected to include review and <br /> consultation on all aspects of the work required to construct the landscaping elements as shown in the <br /> landscape plans and related specs, and as requested by the KBA resident or office engineer, or the City <br /> construction manager. <br /> 10. ENVIRONMENTAL SERVICES <br /> Landau will provide the effort for sampling of stockpiled soil from the area of known potential <br /> contamination. <br /> lgff <br /> 4of15 <br />