My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/09/21 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/09/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 8:37:26 AM
Creation date
2/17/2017 8:37:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/21/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> SUPPLEMENTAL AGREEMENT NO. 2 <br /> To <br /> PROFESSIONAL SERVICES AGREEMENT <br /> This agreement entered into this day of September 2005, by and between the City of <br /> Everett, a municipal corporation under the laws of the State of Washington (City) and <br /> Carollo Engineers, P.C. (Contractor). <br /> Witneseth: <br /> Whereas the City and Contractor entered into an agreement on February 23, 2004, entitled <br /> "Professional Services Agreement" (Agreement) between the City of Everett and Carollo <br /> Engineers, P.C., to provide engineering services for the design of the Weyco Intertie Project, and <br /> on August 19, 2004 amended the agreement by Supplemental Agreement No. 1 to provide <br /> engineering services for the rehabilitation of the existing Weyco pipeline. <br /> Whereas the City and Contractor desire to supplement the Agreement for the purpose of <br /> providing additional engineering services for the design and rehabilitation of the Weyco pipeline <br /> project including the following major categories of work tasks: Project Management, Meetings <br /> and QA/QC; Final Design; Inspection; Rehabilitation and Bidding Assistance; and Services <br /> During Construction and Undefined Services. <br /> Now therefore, the City and Contractor do mutually agree as follows: <br /> All provisions in the Agreement shall remain in effect except as expressly modified by this <br /> supplement. The changes to the Agreement are described as follows: <br /> Amend the previous.Exhibit A, Scope of Work, by adding: "Exhibit A-2 Weyco Intertie and <br /> Rehabilitation Pipeline — Request for an amendment to the original contract". <br /> Amend the previous Exhibit B, Compensation, by adding "Exhibit B-2" which includes an <br /> estimated Project Cost Summary by task for the additional engineering services. <br /> Modify Paragraph 4. Compensation, subparagraph D, which describes the maximum total <br /> compensation, by deleting the existing sentence and replacing with the following sentence: <br /> "Total compensation, including all services and expenses, shall not exceed a <br /> maximum of One hundred Fifty Seven thousand Two hundred Twelve Dollars <br /> ($157,212)."This amounts to an increase of $51,405. <br /> A t of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.