Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> • <br /> PROJECT TITLE: <br /> Call for Bids for Purchase and X Consent COUNCIL BILL# <br /> - <br /> Installation of New Soda Ash Action Originating Department Utilities <br /> Feeder System for the Water First Reading Contact Person John McClellan <br /> Filtration Plant Second Reading Phone Number 257-8201 <br /> Third Reading FOR AGENDA OF 9/21/2005 <br /> Public Hearing <br /> Initialed by: <br /> Department Head _, <br /> CAA <br /> Council President Ij _ <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Filtration Plant Consultant Contract for None Utilities <br /> Design of New Soda Ash <br /> Feeder System <br /> Amount Budgeted $120,000 <br /> Expenditure Required $500Account Number(s): UP-3248-2 <br /> Budget Remaining $119,500 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Water Filtration Plant,constructed in 1983, includes soda ash as one it's water treatment chemicals. The <br /> existing soda ash feeder system is run continuously, 24 hours a day and 7 days a week. The failure of the <br /> soda ash feeder system would result in a misbalance of chemical feeds and possible action by the Snohomish <br /> County Health Department and the state. Maintenance required for the existing system is excessive as the <br /> equipment is wearing out. Brown & Caldwell has prepared plans and specifications for the purchase and <br /> installation of a new soda ash feeder system. Soda ash is a difficult chemical to mix and feed, and also is the <br /> most expensive chemical used at the Plant, and require specialized equipment designed for very specific <br /> purposes. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a call for bids for purchase and installation of a new soda ash feeder system for the Water <br /> Filtration Plant. <br />