My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/10/05 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/10/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 9:11:21 AM
Creation date
2/17/2017 9:10:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> substation. At times these lines (both the North Line and the South Line) carry power <br /> from both BPA and the Jackson Project and, in the event of outage or other emergency, <br /> might carry power to or from Puget Sound Energy. <br /> The Jackson Loop—including the South Line—is used to transmit electricity from <br /> other sources in addition to the Jackson Project, such as electricity from BPA and, under <br /> certain circumstances,Puget Sound Energy. The use of non-project power sources <br /> allows the PUD to service the Goldbar, Sultan,Woods Creek, and West Monroe <br /> substations and provide backup capability to PUD substations served by the Jackson <br /> Loop. This occurs, for example,when the Jackson Project is not generating or the loads <br /> exceed the powerhouse capacity at full generation. <br /> III. DISCUSSION <br /> The Commission should delete the South Line from the Project boundary because <br /> it is no longer a"primary line" for the Project. Section 3(11) of the FPA defines <br /> "project"to consist of, among other things,". . . the primary line or lines transmitting <br /> power therefrom to the point of junction with the distribution system or with the <br /> interconnection transmission system. . . ." 16 U.S.C. § 796(11). A project's primary <br /> transmission line(s) are defined in Section 3(11) as the line or lines"transmitting power <br /> [from the hydroelectric project] to the point of junction with the distribution system or <br /> with the interconnected primary transmission system." The Commission has further <br /> refined the definition of a primary line to include only lines used solely to transmit power <br /> from the licensed project to load center, and without which there would be no way to <br /> 4 <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.