My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/10/05 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/10/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 9:11:21 AM
Creation date
2/17/2017 9:10:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> transmit the project power to market.2 Under this test,the line leading from the project <br /> ceases to be a primary line at the point it is no longer used solely to transmit power from <br /> the project to the interconnected grid.3 <br /> The South Line does not constitute a primary line as that term is used in 16 U.S.C. <br /> § 796(11),because the South Line is no longer used solely to transmit power from the <br /> Jackson Project but is part of the PUD's loop transmission system. It is used to transmit <br /> power from BPA and other sources in addition to the Jackson Project,which allows the <br /> PUD to service the Sultan, Woods Creek,West Monroe, and Goldbar substations and <br /> provide backup capability to other PUD substations served by the Jackson Loop. <br /> Another use of the South Line is to prevent disruption of service in the event of an <br /> outage on the Jackson Loop. If such an outage were to occur,only one circuit (either the <br /> North Line or the South Line)would trip, allowing part of the transmission load to <br /> remain operational. This circuit configuration allows the load connected to the faulted <br /> circuit to be isolated and transferred to the other circuit. Additionally,the South Line is <br /> also used to reduce outage exposure in the event of a BPA Snohomish bus outage. To .. <br /> 2 See, e.g.,Pacific Gas and Electric Co., 85 FERC¶61,411 at p. 62,559 (1998) (finding <br /> PG&E's transmission lines carry flows from other electric generating sources when their <br /> licensed generating units are down, and as such are not primary lines requiring licensing). <br /> 3 See New York Power Authority, 98 FERC 161,033 (2002) (finding that the <br /> transmission line was an integral part of the interconnected transmission facilities under <br /> control of the New York Independent System Operator ISO and was used to transmit <br /> power from both project and non-project sources, therefore the line was no longer a <br /> primary line of the Project);Montana Power Co. and PP&L Montana, LLC, 89 FERC¶ <br /> 62,182 (1999) (stating that the transmission lines should be deleted from the license <br /> because they were no longer used solely to transmit power from the project,but instead <br /> carried power from both project and non-project sources);New England Power Co. and <br /> USGen, Inc., 85 FERC 1 62,113 (1998) (finding that the transmission facilities serve <br /> local areas or interconnected the regional transmission system and are no longer the <br /> primary lines for the project,but rather are part of the regional transmission system). <br /> 5 <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.