My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/10/05 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/10/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 9:11:21 AM
Creation date
2/17/2017 9:10:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contains Critical Energy Infrastructure Information <br /> Do Not Release 5 <br /> among other things,public health concerns, the PUD believes that the security measures <br /> described below are likely to be in effect long-term. Although the VA anticipated the <br /> impacts to the public of the recommended security measures to be low,10 the Federal <br /> Energy Regulatory Commission's ("FERC's")HSP requires licensees to seek <br /> modifications to project recreation plans or other license requirements as a result of <br /> permanent security-related measures undertaken in response to the events of September <br /> 11, 2001.11 Accordingly,the PUD requests that the Recreation Plan for the Jackson <br /> Project be amended to respond to the VA's recommendation that the PUD install <br /> hardened gates that restrict access to and across Cuimback Dam as follows: <br /> • Eliminate public access to Recreation Site 6, Culmback Dam. This site offers <br /> a scenic overlook of Cuimback Dam and Spada Lake with ten parking spots, <br /> viewing benches, vault toilets and trash containers. The installation of hardened <br /> gates on the S6000 Road north and south of Culmback Dam requires the <br /> elimination of public access to Recreation Site 6. <br /> • Restrict public access from the north or south side of Spada Lake across <br /> Cuimback Dam. This will primarily impact access to north side recreation sites <br /> from the south including Recreation Site 8 (North Shore) and Recreation Site 7 <br /> (Pilchuck Entry). Recreation Site 8 offers two scenic overlooks with twenty-three <br /> parking spots, trails, nine picnic areas with tables, fire pits and firewood,vault <br /> toilets and trash containers. Recreation Site 7 provides only directional signs for <br /> those entering the basin from the PK-ML Road. No amenities are provided at Site <br /> 1° Id. at 7-2. <br /> 11 HSP Revision 1 at 4, 10 (requiring long-term security measures affecting <br /> recreation and project use to be coordinated with FERC). <br /> 3 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.