^ � r,sacr 'r i 7tui ry v ipsi IIm , f <br /> EVEREYJc .L, O N } y` � OyER SIEET V-Vki <br /> 7j <br /> 7 <br /> PROJECT TITLE: <br /> Amendment No. 2 Extending X Consent COUNCIL BILL# <br /> the Completion Date for the Action Originating Department Public Works <br /> Professional Services First Reading Contact Person Heather Grif i' <br /> Agreement for the City of Second Reading Phone Number 257-7206 <br /> Everett CSO Control Facility Third Reading FOR AGENDA OF Nov. 30, 2005 <br /> Planning and Predesign with Public Hearing <br /> HDR Engineering <br /> Initialed by: <br /> Department Head j?..ii <br /> CAA <br /> Council President �� ---- <br /> Location Preceding Action Attachments Department(s) Approval <br /> Bond Street Approval of Amendment Amendment No. 2 <br /> No. 1 on October 29, <br /> 2003 <br /> Amount Budgeted $330,200 <br /> Expenditure Required -0- <br /> Account Number(s): UP#2770 <br /> Budget Remaining $76,200 <br /> Additional Required _0_ <br /> DETAILED SUMMARY STATEMENT: <br /> The north end of the City of Everett has a combined sewer system that handles both sanitary and stormwater <br /> flows. Outfalls are part of this system to provide relief during extreme rainfall events. Regulations limit <br /> combined sewer overflows (CSOs) for each outfall to an average of one event per year over a five year <br /> period. In 2002 the City of Everett entered into a grant agreement with the Environmental Protection <br /> Agency (USEPA). The USEPA matched local funds for the planning and predesign of improvements to <br /> four uncontrolled outfalls along Port Gardner Bay. The City also entered into a Professional Services <br /> Agreement with HDR Engineering to complete the CSO Facility Planning and Predesign on December 11, <br /> 2002. <br /> The CSO Control Facility Plan Update was completed by HDR Engineering in 2003. Final Department of <br /> Ecology approval of the Update was held pending the completion of the environmental review process. <br /> Additionally the federal environmental review process was a requirement of the federal grant. Now the <br /> federal environmental review process is complete and the project can proceed to predesign. Amendment <br /> No. 1 was a no cost amendment to the professional services agreement with HDR Engineering approved on <br /> October 29, 2003. Amendment No. 2 is a no cost extension of the contract with HDR Engineering to <br /> complete predesign services by September 1, 2006. <br /> RECOMMENDATION: <br /> Authorize the Mayor to sign Amendment No. 2 to the City of Everett CSO Facility Planning and Pre-Design <br /> professional services agreement with HDR Engineering that extends the completion date to September 1, <br /> 2006. 2 5 <br />