Laserfiche WebLink
12 <br /> Exhibit "B" <br /> Consultant Fee Determination - Summary Sheet- Perteet,Inc. <br /> Project: East Marine View Drive-Phase III PS&E-Amendment No.4 <br /> Client: City of Everett <br /> The City shall pay the Contractor and Subcontractor a sum equal to the amount of hours actually worked <br /> multiplied by the hourly rates identified below for the staff performing the work,plus the overhead cost and fixed <br /> fee amounts also described below, subject to the maximum stated in Section 4(D)of this Agreement. <br /> HOUR ESTIMATE <br /> Classification Responsibility Rate <br /> Crystal Donner Senior Associate $55.29 <br /> Bill Bovey Project Manager $37.26 <br /> Tom Collins Project Manager $34.32 <br /> Mark Holmes Project Engineer $32.72 <br /> Oscar Fuentes Project Engineer $22.50 <br /> Mike Schaefer Technician $27.50 <br /> Wendy Nelson Clerical $20.00 <br /> OVERHEAD 173.61% <br /> FIXED FEE 35% <br /> Rates shown reflect the typical compensation rate of employees assigned to the billing category listed. <br /> Each category may have multiple employees assigned to that billing category and each employee may have <br /> a different hourly rate of pay. Employee compensation is subject to adjustment in June of each calendar year. <br /> Name: Crystal Donner Date: November 18, 2005 <br /> J:\Contracts\Transponation Design\Everett\EMVD\Phase 11l\/Amend 4 erh.c B&C 11-17-05.44E.rhibit B&C amend 04 <br /> J:\Trans_Design\23023-COE East Marine View Drive\Contract\Everett Amendment 4 11-I4-05.doc Page 4 of 5 Cl E <br />