Laserfiche WebLink
�i <br /> R�2nIR S?�CI?ICn:IGNS .1;7D LIST OP W04TC TO 3E HID �F' 1 �� <br /> ' _— —� �'1 c�C P'4e �0� / <br /> Address; �2105 Lor, �� .d i ��— <br /> 1. Roof 8 u -ter"s Install new 235# asphalt composition <br /> roofing over existing roofing. Do not tear off existing <br /> zoof. New roofing . installed in accordance with <br /> manufacturer ' s recommendations and carry a 20 year <br /> limited warranty. Register date of application with ' <br /> manufacturer. Znstall new rake edge flashing over <br /> existin9 roofing before application of new roof. <br /> Replace damaged section of gutters on the west side, <br /> north corner , to match existing. <br /> $ /`�/��• 7� <br /> 2. Exterior Painting Scrape all loose paint on existing <br /> siding to bare wood. Prime all new and bace wood on <br /> siding and porches. Paint entire house excluding trim, <br /> one coat, oil base paint, to match existing. Apply two <br /> coats to all new work and over bare wood. <br /> � � ��� �a z <br /> 0 <br /> . � <br /> 3. Porch Work Replace deck on front porch with new T & r, <br /> G boards to match existing. Replace any rotted !� <br /> structural members under porch deck before applying new <br /> decking. Prime front and rear decks and steps as per ,� ,� <br /> item #2 and paint with oil base deck paint with abrasive -' "^ <br /> admixture, owner choice of color . i� _ <br /> 0 <br /> m <br /> Install new wood handrails down front and back steps to m o <br /> code Handrails : _return top and bottom and be painted _ � � <br /> as per item �2. Install railing down back steps on east � � ' <br /> m <br /> Side Gf Steps. m -�i <br /> .. <br /> Securelp Gcace outside corner of front porch and remove �D� <br /> post and rail. Install new post as per drawing. r � <br /> —I N <br /> Chip out stucco fill along nocth side of front porch o A <br /> steps. Cut new board, notched for steps, to fill down -nn <br /> steps. Caulk along house. = m <br /> � $ � / o �� _ m .-, <br /> N <br /> - o r <br /> c-� m <br /> c cn <br /> 4. Windows Replace existing wood frame windows with new m N <br /> insulated replacement windows , Milgard or equal, � � <br /> anodized bronze with screens on openable windows as per • n <br /> the following schedule: . � <br /> � <br /> x <br /> Room Location Window Type z <br /> --i <br /> Liviag Room South Wall Single hung in middle � <br /> Raw units on each side "' <br /> z <br /> 0 <br /> Dining Room South Wall Single hung in middle � <br /> Raw units on each side m <br /> East Wall Both single hung <br /> , Bteakfast Nook One single hung, one raw unit in <br /> each wall <br /> East Bedroom North Wall Out-opening casement, (egress) <br /> � � � C� � OdC�. � <br /> F�-� 14 198:i <br /> � <br /> ................................................................_... , <br /> CITY OF EVERET7 � <br /> Pel'ic N,'cri<s De,;. � <br /> _ ' <br /> 1 <br />