My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2105 LOMBARD AVE 2018-01-02 MF Import
>
Address Records
>
LOMBARD AVE
>
2105
>
2105 LOMBARD AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 3:10:14 PM
Creation date
2/17/2017 5:28:11 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2105
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_� <br /> P:2r+i� S?�CI:ICn�ZG::S :�:1D i,IjT OP W04.K i0 Bc'. 3ID <br /> � Page 3 OF � <br /> Address : 2i0:. Lor,ibard <br /> East Wall Single hung <br /> west Bedroom One out-opening c�seuient, (egress) <br /> One raw unit <br /> Upstairs South Bedroom headerme(app ox 3°P higher Wopeninc <br /> foc new slider (egress) � <br /> Upstairs North Bedsoom Same as upstairs south bedroom <br /> All new windows : fit existing openings , except as noted <br /> above. All raw units : stopped in with wood, primed and <br /> painted two coats to match existing trim paint. <br /> Upstairs bedroom windows : r�-tcim�aed for new height. <br /> Replace sill on upstairs south bedroom. Do not modify <br /> windows not included in above schedule. Z <br /> � <br /> $ ,�D c�3`t '� m <br /> 5 . Landscaping Grind ouc stump of removed tree in <br /> front yard. Owner : cover with soil and finish grading. � T <br /> ., -i <br /> Remove concrete walk from sidewalk to front porch steps "' m <br /> and around towatds side of house to first clean edge or �c o <br /> m o <br /> cut new edge to abut to new walk. Excavate and form for �, <br /> new concrete walk. Place 6" x 6" x #10/10 welded wire o m <br /> fabric the length_ of the new walk. Pout new conGrete --� � <br /> walk, bcush finished, with wire fabric held to top 1/3 �, <br /> of slab. Provide 1/2" expansion joint where new walk .� < <br /> meet� existing concrete. Protect work from damage. a = <br /> caused by frost or freezing . Do not use calcium .� <br /> chloride in concrete. Float so that water does not 1 T <br /> puddle on walk. � a <br /> � / • S � = m <br /> $ � — R, .� <br /> N <br /> 6. Doors Install new pce-hung steel door , owner choice o m <br /> of �tyle and finish, material allowance : $250 . Dooc : � N <br /> include al:: necessary hardware including threshold and <br /> weatherstripping. Install new long throw deadbolt lock ,-z{ m <br /> on front door , back door and door to basemer.t to operate D <br /> with same key, Schage cr equal , and provide owner with � <br /> x <br /> two sets of keys. D <br /> z <br /> install wood door (replaced by metal door) to replace = <br /> existing door to basement. Install new passage �, <br /> latchset, threshold and weathecstripping . o <br /> � <br /> Replace glass lite in door to stairs to second floor c; <br /> with new double strength glass. m <br /> install new wood panel bifold closet doors in west <br /> bedroom closet to fit, including all necessary <br /> ' hardware. Owner choice of finish. Replace door and <br /> frame to west bedroom with new wood panel door , same <br /> size opening as existing, including hardware. Owner <br /> choice af finish,. - <br /> I <br /> ! <br /> ( <br /> . ' _ <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.