Laserfiche WebLink
• cZ52;sI� 5?rCI?IC.,.IG:iS n:ID LiST OP ��OR:{ TO Bc 3ID <br /> . Page L� Q�7 <br /> Addr�s�: 2105 Lor.ibard <br /> Ir.stall new flush by-pass closet doors in each upstairs � • <br /> bedroom closet to match opening width including <br /> hardware. After trimming door height to fit, insert <br /> plug in bottom to fit and pcovide rigidity to doors. <br /> Owner choice of finish. <br /> Install new pre-hung, flush, hollow core door in new _ <br /> wall in basement as shown in drawings. Door : 3 ' 0" , <br /> prefinished. Provide passage latchset. � <br /> $ /l? �'i' �' <br /> 7. Floors Remove existing vinyl floocs and underlay in <br /> kitchen and bathroom. install new 3/8" ui:derlayment <br /> grade plywood over sub-floor . Install new vinyl sheet <br /> goods over underlayment using manufacturer ' s approved <br /> adhesive and edge bars. Material allowance for sheet o <br /> goods : $14/sq. yard retail. Owner choice of style and � <br /> color. Reinstall existing base trim. !�^ <br /> Install new carpet and 3/8" rebond pad in dining room, � � <br /> stairs to upstairs and upstairs hall, and in each --� -� <br /> upstairs bedroom. Owner choice of color and style. <br /> .. .� <br /> ard retail. � _ <br /> Material allowance for carpet . $14/sq. y o m <br /> Install using manufacturer ' s approved tack strips. m o <br /> Minimize use oE seams in carpet. Seams in patterned � � <br /> carpet : match. � z <br /> � $ � 9:�� •c� 3 m -� <br /> .. <br /> .� � <br /> � <br /> 8 . Walls � Ceilings Tea� out ceiling over upstairs hall � _ <br /> and stairwell. Znstall new lj2" gypsum wallboard, � tape ; �, <br /> aad spackle for textured surface. Install new 3/8" � �, <br /> gypsum wallboard over ceilings and sloping sidewalls in � A <br /> -*, a <br /> each upstaits bedroom. Tape and spackle for textured � m <br /> surface. Spray texture new gypsum wallboard surfaces , m .� <br /> � <br /> knock down finish. <br /> o r <br /> � m <br /> Tear out ceramic tile above countertops in kitchen. � n <br /> Remove plaster up to 1eve1 of new laminate. (see item � � <br /> 9) . InsEall new gypsum wallboard to match level of • n <br /> plaster , ready for new laminate. Do not remove tile � <br /> window sill. . _ <br /> � n <br /> z <br /> Paint kitchen with two coats latex enamel, owner choice � <br /> of colar . Paint east . bedroom, west bedroom, uostaits = <br /> hall and stairwell, and both upstaits bedrooms , two �' <br /> coats flat latex, owner ' s choice of color . o <br /> � <br /> .. <br /> Patch holes in wall behind vanity base in downstairs m <br /> bathroom. Owner will paint. <br /> Install new wood stud wall across basement as shown in <br /> , drawings. Apply 1/2" gypsum wallboard on east side of <br /> new wall only. Do not tage or spackle. Anchor wall top <br /> and bottom and frame for new door as shown. <br /> $ �0 � � Sv - <br /> i <br /> _ . � - <br /> � <br />