My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2218 LOMBARD AVE 2016-01-01 MF Import
>
Address Records
>
LOMBARD AVE
>
2218
>
2218 LOMBARD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 5:50:30 PM
Creation date
2/17/2017 5:50:20 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2218
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' REPAIR SPEC L•CATIONS AND LIST OF WOsZh �O BE SID <br /> Page �l c� 1[% <br /> Ad3ress: ZZ18 �QyY) b(Q,{r� <br /> Fabricate and install new hinged closet doors in the <br /> living room, kitchen, and bedroom closets. Loors <br /> flush, include passage latch hardware. Znstall door <br /> trim. <br /> Laundrv Room (Off Unit 1) <br /> Remove door between laundry room and pantry area. <br /> $ ��V�J <br /> 6. Walls & Ceilin s Prepare all interior wall and <br /> ceiling surfaces for paint. (Special instructions <br /> rollo�) Tape and spackle to match adjacent surface <br /> textures. Prime all bare gypsum wallboard (gwb) before <br /> painti�g. Paint interior throughout with two coats � <br /> interior latex, owner choice of color. H <br /> n <br /> Unit 1 �' <br /> Frame in and seal off doorway between the kitchen in <br /> Unit 1 and the laundry room. Remove existing door <br /> tri.m. Cover with 1/2" gwb both sides. y � <br /> Tear out kitchen ceiling and install new 1/2" gwb. �' � <br /> "_'�ai out bathroom ceiling, tub surround and all rotted � <br /> wa�.l surfaces. Install new 1/2" water resistant gwb � <br /> over aeiling and -�aalls around tub. install new tub - � <br /> surround, onP piece and secure using manufacturer 's <br /> � approved adhesive. Reinstall existing shower door after �o z <br /> _ cleaning. c <br /> � � <br /> Do not paint wainscotting in living room. , � �' <br /> Unit 2 ° � <br /> Tear off paneling from east wall' of living room. � m <br /> Cut new openinq in wall of bedroom for new window (see � <br /> item 5) . Provide proper header over opening and patch �' <br /> interior with gypsum wallboard .to match level of , � <br /> adjacent surfaces. b <br /> � <br /> Tear off tub surround and rotted wall surface behind � <br /> WC. Install new 1/2" water resistant gwb. Replace tub <br /> surround with -new one piece unit and secure using � <br /> manufacturer's approved adhesive. Reinstall existing H <br /> shower door after cleaning. �' <br /> L'nit 3 � <br /> H <br /> n <br /> ro <br /> Tear out existing shower and all deteriorated wall <br /> surfaces in bath. Replace stub wall on .east side of new <br /> shower to run to ceiling. Cover with 1/2" water <br /> resistant gwb. <br /> Tear out existing kitchen cabinets complete. Cover with <br /> 1/2" gwb as necessary. i•rame in and seal off doorway <br /> . between bath and hallway, Remove door trim. Cover with <br /> 1/2" gwb both sides . Cut new opening to connect <br /> bathroom with kitchen (see drawings) . Provide header, <br /> framing and casing for .new door location. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.