My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2218 LOMBARD AVE 2016-01-01 MF Import
>
Address Records
>
LOMBARD AVE
>
2218
>
2218 LOMBARD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 5:50:30 PM
Creation date
2/17/2017 5:50:20 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2218
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPAIR SPEC"'iCATIONS AND LIST OF S40RI '0 BE BZD <br /> , Page j c� �� <br /> Address: Z.Z1 u �om �xzrd <br /> Unit 4 <br /> Patch existing walls in bath as necessary for new shower <br /> unit. <br /> Laundry Room <br /> See Unit 1 this item, door between kitchen of Unit 1 and <br /> laundry room to be removed, opening covered. <br /> s 3 �..@ta ! <br /> ;. Floats <br /> All underlayment : A-C plywood, exterior glue. Owner <br /> will install new vinyl and base, contract�r : prepare � <br /> floors for new vinyl as follows: � <br /> m <br /> Unit 1 • �� <br /> Teac out bathroom floor to subfloor. Replace any rotted <br /> subfloor materials. Install 1/2" underlayment, patch H H <br /> ready for vinyl, y '� <br /> � �Patch kitchen flaor ready for new vinyl. � <br /> Unit 2 <br /> � <br /> Patch kitchen floor ready for new vinyl. - � <br /> H <br /> Unit 3 '� z <br /> � � <br /> Install new joists to raise bathroom floor to .1eve1 of � m <br /> apartment floor. (see drawings for new layout) In�tall <br /> 1/2" CDX subfloor and 1/2" underlayment, patch ready for � � <br /> vinyl. � <br /> H <br /> Patch kitchen floor ready for new vinyl. �' <br /> IInit 4 � <br /> Tear out bathroom floor to subfloor. Replace any rotted • � <br /> subfloor materia].s. Install 1/2" underlayment, patch <br /> ready for vinyl. � <br /> Laundry Room (Off Unit 1) <br /> � <br /> Install 3/8" underlayment and patc!� ready for new vinyl. n <br /> $ S SD" � <br /> 8. Cabinets All new cabinets . wood grain plastic � <br /> laminate veneer over particle board, NRCA certified. <br /> Shelves adjustable, doors self closing hardware, <br /> drawers :�' run on extruded aluminum guide rails and guide <br /> support with nylon bearings. Plastic laminate : owner <br /> choice of color. <br />
The URL can be used to link to this page
Your browser does not support the video tag.