Laserfiche WebLink
.. <br /> �� i <br /> . , , <br /> •z <br /> i <br /> I <br /> I <br /> � <br /> CITY OF EVERE`iT � <br /> SPECIAL PROPERTY USE PER?IIT <br /> SPU �1-93 ! <br /> TRINITY LU'CHERAN CHURCH DAYCARE �' <br /> i DATE: June 3, 1943 i <br /> I I <br /> WI�4tF.1►.S, there was filed with the City of Everett Planning i <br /> Department on April 2, 1993 , an application for a Special <br /> IProperty Use Permit, under Everett Municipal Code (E.M.C. ) by <br /> Trinity Lutheran Church, 232h Lombard Avenue, Everett, WA, 98201, i <br /> c?esC.ribed as follnws: � <br /> A request for a Special Property Use Permit I <br /> to allow a commercial daycare within an <br /> existing church building. The daycare would <br /> operate with up to a maximum of 27 children <br /> at any given time. No internal improvements <br /> are proposed to the building at this time. <br /> Exterior site improvements would include a <br /> fenced play area along Lombard Avenue. <br /> � <br /> WHEREt.S, after proper notice was given as required by law, a <br /> public hearing was held on May 6, 1993 , before the City of <br /> Everett Land Use Hearing Examiner; and <br /> � W�S, after due consideration of the testimony and <br /> evidence submitted at the public hearing, and as a result of a <br /> personal inspection of the subject property and surrounding <br /> I areas, the Hearing Examiner made findings and conclusions and <br /> �«����a y �o�j,_=�� :n p!�y iq, 1.993 ,- to GRaNT a Snecial ProAerty <br /> � Use Permit with the following conditions: <br /> _ 1. Detailed drawings in accordance wiih City Design and <br /> I Construction Standards shall be submitted to the Public <br /> Works Department showing site parking layout, landscaping, <br /> utilities, storm drainage, temporary construction erosion <br /> control, and all required improvements in the public right- <br /> of-way. Public Works Department approval of these drawings <br /> is required prior to any permits being issued. All <br /> improvements shall be completed, approved, and warranted <br /> before Occupancy permits are issued. <br /> 8� . A water/sewer connection fee must be paid at the time of <br /> building permit issuance. <br /> . A parking study prepared by the applicant indicated that the � <br /> I existing 16 off-street parking stalls, combined with <br /> available on-street parking, woul.d be sufficient for the <br /> proposed daycare. The Traffic Engineer and Planninq <br /> Uepartraer�E c:oncur with this fir.d_r.g. <br /> � �,.- . Placement and screening of refuse disposal areas must be� <br /> provided per Section 39.080 of the Zoning Code. <br /> 1,�� QT� <br /> (�,`��a.,U' 5. A no-fee lease must be executed for the portion of the <br /> v�" right-of-way to be used as fenced play area or required I <br /> landscaping. <br /> I 6. Landscapinq must be provided around the perimeter of the ; <br /> site. However, because of tne location of existing , <br /> � improvements on the site, it is not possible to meet the � <br /> I landscape requirements of Section 35 of the Zoninq Code ; <br /> (landscape category "B") . Therefore, landscaping must be � <br /> � I provided in the following areas: <br /> 1 <br /> ,I <br />