My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3025 LOMBARD AVE 2018-01-02 MF Import
>
Address Records
>
LOMBARD AVE
>
3025
>
3025 LOMBARD AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 3:07:09 PM
Creation date
2/17/2017 7:29:02 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3025
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVerett Ho�ising Authority <br /> SPU 18-8a <br /> Page -6- <br /> 9. Zhe App.li.cant is required to adhere to the conditions of the mitiqated <br /> Declaration of Non-Significance. 7liese are: <br /> 1. A construction schedule wi11 be approved by the Public Works <br /> Dept. to minimize impacts on parking and public services during <br /> construction. (SEPA Transportation Public Services Policy) <br /> 2. The Applicant shall provide progcartis that emphasize utilization <br /> of transportation options, such as senior vans, EVerett Transit, <br /> caz pooliny and satellite packing. The programs shall e�hasize <br /> the need to use these options at special events and must be <br /> reviewed by the F�ublic Work� Director. (S�A Transportati�n <br /> Policies) <br /> 3. Provide an identification sy:stem for seniors using parking area <br /> to help control unauthorized parking. (SF�A Transportation <br /> Policy) <br /> 4. Approval of long term lease cn north-south alley from Broadway to <br /> Templeman propertt is required before SPU Permit is issued. <br /> (Public Services and Utilities) <br /> I[gOFMATION FOR DEVIIAPER <br /> 1. �e E�erett p3rks IA�partment would be interested in claiming <br /> landscaping materials that might be destroyed in the bcpansion Phase. <br /> (Phone 259-0300) <br /> 2. G1B Northwest has camnented thaL• they have facilities at this <br /> location. However, any building enL•rance must be coordina�.ed at least <br /> 60 days in advance. Your contact at GPE Northwest is EYank Taylor at <br /> 33:3-2035 for this buildi.ng entrance. <br /> 3. A pre-application meetirig with the Building Departrnent is recommended. <br /> Done arx3 dated th�s 4th day of November, 1968. <br /> �J'����� ��1. �.�G4-Ca�- <br /> U <br /> Jam�s M. Driscoll <br /> Zhe decision on this applicati��n h�s been �de by the Hearing ncaminer hased <br /> on the authority granted in Ordinar�ce 692-80 as a�nended. Zt is final unless <br /> the following procedute is followed; <br />
The URL can be used to link to this page
Your browser does not support the video tag.