Laserfiche WebLink
�PAIR S2ECI' :n�IGNS ?,.�1D LIST OP WORK i BE BID <br /> � Page 1 of 13 <br /> Address: 3406 Lombazd <br /> 1. Roofing & Gutters Tear down existing chimney in the . <br /> middle of. the, house complete through the downstairs <br /> kitchen. Tear off roofing on house complete to <br /> sheathing. Replace all rotted starter boards. Patch <br /> hole at chimney flush with existing sheathing. Instali <br /> new 7/16" O.S.B. over roof complete. Install anodized <br /> metal 3rip edge on all rakes and eaves. Install 15# <br /> asphalt impr=gr.ated felt over existing sheathing. <br /> Install 220# fiberglass composition shingle coofing over <br /> house complete in accordance with manufacturet ' s <br /> installation instructions. Owner ' s ck�oice of roofing <br /> co?or . <br /> Cut all notched rafter tails on house plumb and install <br /> l x 6 tight-knot facia on all eaves. Install continuous <br /> aluminum 5" R style guttets and matching downspouts. <br /> Slope gutters to drain to downspouts. Secure gutters <br /> 48" O.C. Secure downspouts top, bottom and all joints . <br /> Seal all joints with approved caulking. Provide splash <br /> blocks at aZl downspouts. Owner choice of gutter <br /> coloc. Prime facia before installing new gutters . <br /> $ ��.29 � °v <br /> 2. Porch See drawings , page 8 of 13 for porch railing <br /> design. Install new pressure treated backing for <br /> skirting around porch. Install cedar lattice skirting <br /> as shown on three sides of existing porch. Install 1 x <br /> 12 band board, tight knot cedar , on rim of porch to lap <br /> over top edge of skirting. <br /> . Install new railing around porch and down ste,ps as <br /> shown. Top rail : tie into posts and consist of three 2 <br /> x 6's, finger joint fir , wrapped around a 2 x 4 . ' The <br /> bal.luster tailing : consist of 2 x 4 's, cedat . Install <br /> 4 x 4 posts , pressure treated, at top and bottom of both <br /> sides of stairs , anchored thtough deck at top and bolted <br /> into the concrete steps at bottom. <br /> App1y two coats oil base deck paint on front and rear <br /> pocch decks after scraping a11 loose paint and priming <br /> all bare wood. Primer and paint . oil base, owner <br /> choice of paint color . <br /> � 9cr � �� <br /> 3. Exterior Siding Power wash and scrape loose and <br /> peeling paint from siding and exterior woodwork on house <br /> and garage_ Ptime all new and bare wood with oil based <br /> primer. Paint entice house, two coats , one color, owner <br /> choice of color, exterior gcade latex paint_ <br /> Remove loose glazing compound from all windows and <br /> reglaze before painting. <br /> $ � l 3bf' °'—' <br /> 4. Site Work See drawing page 9 of 13 for location of <br /> gravel parking area. Excavate top three inches of sod <br /> and topsoil within parking area. Spread washed gravel <br /> over parking area compacted to three inch dept:� <br /> throughout. <br /> �n <br /> � 3�5't', - <br /> _,,. .. ,.. . _ . ... _ . .. : .. - - . <br /> .. . ... <br /> o. — <br />