Laserfiche WebLink
12E2AIR S?E ?IC'nTI0i1S itND LIST OP LdOFt ?'0 3E flID <br /> Page Z of 13 <br /> Address : 3406 Lombard <br /> �-. <br /> 5. Framina All new framing : 2 x 4 construction , 16" <br /> O.C. See drawings , pages 10 , 11, 12 , ].3 of 13 for <br /> layout and details of a11 framing work. <br /> Install new stairweii i�om main floor to second f.loor as <br /> shown. Treads 10-1/2" , single piece; risers . <br /> appcoximately 7-1/4" ; stringers . 2 x 12 ' s . frame <br /> stairs through main floor coat closet as shown, (note <br /> rel.ocated door, item 8) . Tear out railing on second <br /> floor foX existing stairs and frame new floot joists <br /> u5;.ng joist hangers . Provide 6 ' 6" clea�ance at al.l <br /> points from tread nosings and do not uisturb the <br /> junction of the floor and wall at the west wall of the <br /> east bedroum upstairs : Install new wall separating <br /> staizs from downstairs unit. Install new walls <br /> upstairs, remove existing walls and install new openings <br /> and seal off existing openings as indicated in the <br /> drawings . <br /> Znstall new shed dormer on west wall oi southwest corner <br /> of upstairs for new kitchen. All necessary zoofing . <br /> provided as per Item 1. Install 7/16" O.S .B. sheathing <br /> on new exterior wall, 15# felt and new clear beveled <br /> cedar siding to match house siding. Window trim : as <br /> per existing house windows . Rafters : 2 x 6 's , pitch : <br /> 4:12. Install new facia and barge board, � all to roof <br /> L•lashing and other details necessary to provide a <br /> finished dotmer enclosure. Insulate shed dor•r:=r wall <br /> and ceiling with R-11 fiberglass batts with vapor <br /> barrier. <br /> Install wa11 to cover opening in kitchen to northwest <br /> bedtoom. Build wa11 around old stairwell to second <br /> floor with opening on north end for a door_ <br /> � .r? G`�!}'D . =°�._ <br /> 6 . Walls & Ceilings Install new 1/2" gypsum wallboard, <br /> taped and spackled for texture ( "otange peel") finish, <br /> (except smooth wall on the upstairs bath) as follows. <br /> - Second floor walls and ceilings (tear off existing <br /> panel.ing) except kneewall area closets . <br /> - Main flooc living room, dining room, stairwell `o <br /> sFcond floor, and kitchen (tear off existing <br /> paneling) . <br /> - New closet walls and ceilings as necessary for the <br /> northwest bedroom downstairs , coat closet <br /> downstairs (with new �=ntry on west side under <br /> stairs) and new closet downstairs around old <br /> stairs to second floor. <br /> Apply drywal]_ sealant/primer pcior to texture and paiat. <br /> Finish doorway between kitchen and dining room <br /> down.stairs with g.w.b. (no wood trim) . <br /> Remove ceiling vents before applying g.w.b. where <br /> applicable. <br /> Patch g.w.b. by window in downstairs bath as necessaryr <br /> (see item 9) , smooth wa11 finish. <br /> . Install attic access panel in ceiling of second floor. <br />