Laserfiche WebLink
REPAIR SPE .'IC�TIONS ADID LIST OF WOR. I'0 BE BID <br /> Page 5 of i3 <br /> Address : 3406 Lombard <br /> Install new shower door for neo-angle shower in upstairs <br /> bath. Install in accordance with manufacturer ' s <br /> instructions. <br /> C1ose and seal fireplace damper in downstairs living <br /> room with masonry cement. Remove damper handle and plug <br /> hole with mortar . <br /> Install owner ' s bathroum accessories in upstairs <br /> bathroom, including towei bar , medicine cabinet and <br /> toilet paper holder. Provide backers as necessary for <br /> proper installation. Install owner ' s surface mounted <br /> medicine cabin�t in downstairs bathroom. <br /> Install closet rods and shelves in closets in the west <br /> be�3room downstairs , the living room closet (under new <br /> stairs) downstairs and bath upstairs bedrooms. Shelves <br /> • 1/2" particle board. Paint shelves as per Item 6 , <br /> leave rods un£inished. Shelves : minimum 14" deep. <br /> Remove heating oil storage tank from north side of <br /> house_ Remaining oi1 : removed by the owner . Cut off <br /> fuel line at foundation ar,d cap. <br /> $�� 2 .�` <br /> 11. Plumbing All new plumbing work called for in this <br /> item , in accordance with the National Plumbing Code, <br /> 1979 edition. The contractor : responsibl.e for patching <br /> after plumbing work. <br /> Replace all existing galvanized house service plumbing <br /> with new copper . Separate plumbing service piping to <br /> each unit. A11 new house service : cooper. install new <br /> waste/vent plumbir.g for upstairs kitchen and bathroom_ <br /> Install new plug on cleanout in basement. <br /> Install new electric 52 gallon hot ;vater tank in <br /> basement neat main waste stack. Relocate existing hot <br /> watet tank next to new hot water tank. insulate both <br /> tanks with fiberglass blankets and install on rigid foam <br /> insulated pads. <br /> Install new fiberglass neo-angle corner shower pan in <br /> upstairs bathroom. See drawing, page 10 of 13 . Install <br /> new economy, A grade water closet in upstairs bathroom. <br /> New plumbing fixtures : white. Provide new hardware for <br /> shower and lavatory upstairs, Delta or equal. See <br /> drawings for locations of new plumbing x"ixtures. <br /> Install owner ' s kitchen sinks in upstairs and downstairs <br /> kitchens. Provide new hardware including sprayer hose, <br /> Delta or equal. <br /> $ .� 7f�6 `= <br /> .: <br /> 12. Electrical All new electrical work called for in <br /> this item : in accordance with the National Electrical <br /> Code, 1981 edition. The contractor . responsible for <br /> all patching after electrical work. <br />