Laserfiche WebLink
Plan Check li41166 <br />July 20, 1993 <br />Page Two of Two <br />.-. <br />In order for the processing of you•r application to continue, it will be necessary to <br />provide the Building Department with two complete new sets of drawings reflecting the <br />corrections requested. <br />Upon re-submittal of the drawings, your application will be given priority and plan <br />review recommence. <br />All required submittals s1ia11 be of sufficient detail and contain sufficient information to <br />ensure that the proposed sWcture will be consWcted in compliance with all adopted <br />codes. <br />Sincerely, <br />Jeff Heilman <br />Development Technician <br />.�,�me�z <br />