Laserfiche WebLink
L� <br />i <br />CLOSED CM WORR ORDERS REPORT <br />Total Jtility Maintenance Management System pve.r S�Oo'D <br />12/22/1997 Page 1 <br />_________________________________________________ <br />- ------------------------------- <br />Date Range :O1/09/1989 - 12/22/1997 <br />CM Work Order Range :0810800810000 - UT2830-30-322Pattern :7101236730243 <br />T_tem Range :<Blank> - WVI,3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />------------------------------------------------------------- <br />------------------ <br />CM WORK ORDER ID: 7101236730243 Title: INSTALL 6220 LOMDARD <br />«DUPLICATE PRZNTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 123 Activity 673 <br />Date Completed: 12/02/1997 <br />Overall Craft: <br />Issued: 10/14/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: HN <br />Labor: <br />Craft ID <br />HEO AAL <br />SUPl AGA <br />EO MJL2 <br />UL NCR <br />DLI QDR <br />EO SDK <br />WST TDE1 <br />UL WTE <br />Ma.terials : <br />ID <br />ADAP34000447 <br />BRIC00061156 <br />BRIC00061156 <br />BRIC00061156 <br />CEME00061438 <br />CEME000.61438 <br />CEME00061438 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />Issued by: HDA Assigned to: AGA <br />Priority: TraveJ_ Time: 0.00 Hr. <br />Name <br />ARNOLD, ARTHUR L <br />AHLES, GREGORY A. <br />MITCHELL, JEFFREY L. <br />NIETHAMEP., CHARLES R. <br />QuINN, DAVID R. <br />STUAFtT, DARP.ELL K. <br />THOMPSON, DPIAYNE E. <br />WESTVANG, TERRY S. <br />Descrip�ion <br />------------------------------ <br />ADAPTER 3/4" IPS UNION INSTA (� <br />BRICK CONCRETE 2" X 4" X 8" <br />BRICK CONCRETE 2" X 4" X 8" <br />BRICK CONCRETE 2" X 4" X 8" <br />CEMENT 20 MIN. SET 50 LB. BAG <br />CEMENT 20 MIN. SET 50 LB. BAG <br />CEMENT 20 MIN. SET 50 LB. BAG <br />CB15 FRAME/GRATE (ASSOC) <br />CB 15/RISER (ASSOC) <br />2"X4"X8" RED SRICK (SALV) <br />TOP COARSE (ASSOC) <br />TOP COARSE (ASSOC) <br />DUMP FEE (ASSOC) <br />CB 15/RISER (ASSOC) <br />CB15/FR�1ME/GRATE (ASSOC) <br />C.D.F. (ASSOC) <br />CB17/FR11ME/GRATE (ASSOC) <br />Planned Hrs Actual Hrs Cost <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />61.00 <br />1h.00 <br />62.00 <br />56.00 <br />18.00 <br />46.00 <br />1.00 <br />1.00 <br />1?34.03 <br />�13.04 <br />12'_.3 . 96 <br />fi83.68 <br />144.00 <br />880.90 <br />19.15 <br />15.78 <br />Total Labor Cost: 4704.54 <br />Date # Used Cost <br />-------- -------- ---------- <br />11/19/1°97 2 18.2"l <br />11/12/1997 20 5.40 <br />11/18/1997 26 7.02 <br />11/20/i997 26 7.02 <br />11/12/1997 3 35.52 <br />11/18/1997 4 47.36 <br />11/20/1997 2 23.68 <br />11/13/1997 1 263.17 <br />11/17/1997 1 116.96 <br />il/18/1997 5 0.00 <br />11/18/1997 1 71.89 <br />11/18/1997 1 251.30 <br />11/18/1997 1 257.27 <br />11/18/1997 1 116.96 <br />11/18/1997 1 526.34 <br />11/20/1997 1 87.72 <br />11/20/1997 1 55�1.18 <br />