My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6220 LOMBARD AVE 2016-01-01 MF Import
>
Address Records
>
LOMBARD AVE
>
6220
>
6220 LOMBARD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 5:09:27 PM
Creation date
2/17/2017 8:55:48 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
6220
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenar.ce Management System paqP L__ <br />12/22/1997 <br />Date Range :O1/09/1489 - 12i22�1997 <br />CM Work Order Range :0810800810000 - L7'P2830-30-322Pa�teTn .*101236730243 <br />Item Range :<Blank> - T�`�L3694LOActivity �L <br />Program ALL Function ALL ________________________________________________ <br />CM WORK ORDER ID: 7101236730243 (continued) <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />pIPE34060647 <br />pIPE4G304347 <br />plp�:�630�i347 <br />PIPE963C'4347 <br />pZPE46304347 <br />PIPE46304347 <br />pIPE46304347 <br />Vehicloe: <br />ID <br />V0010 <br />V2230 <br />�72'G 31 <br />V3507 <br />VJ0004 <br />VJ0026 <br />CB15/RISER (ASSOC) <br />DIIMP FEE/TOP C��SE (A(ASSOC) <br />DUA1P FEE (ASSOC) <br />C.D.F. (pgSOC) <br />TOP COARSE (ASSOC) <br />C.D.F. <br />pIPE 3/4" POLY I.P.S. <br />PIPE 8" PVC 3EWER <br />pipg g�� PVC SEWER <br />pipg g�' PVC SEWER <br />pZPE S" PVC SEWER <br />pIPE 8" PVC SEWER <br />PIPE 8" PVC SEWER <br />Description _ _ <br />'92 GMC S10 PU <br />91 FORD FSUO DUb7P 5 <br />90 FORD DL1MP 5-YARD <br />88 CASE BACKHOE 4X4 <br />'95 CHEV 1-TON <br />'97 FORD 1 TON SVC <br />�� <br />TRliCK <br />11/21/1997 <br />il/21/1997 <br />11/21/1997 <br />11/z4/199% <br />11/24/1997 <br />12/09/1997 <br />11/19/1997 <br />11/12/1997 <br />11/17/1997 <br />11/18/1997 <br />?1/18/1997 <br />11/20/1997 <br />11/21/1997 <br />1 64.98 <br />1 438.17 <br />1 42.41 <br />1 233.93 <br />1 139.78 <br />1 146.21 <br />4 0.76 <br />�g 165.'-� <br />�g 165.36 <br />52 110.24 <br />52 110.24 <br />65 137•80 <br />39 82.68 <br />Total Material Cost: <br />Hours <br />8.00 <br />54.00 <br />46.00 <br />62.00 <br />56.00 <br />1.00 <br />Total Vehicle Cost: <br />Total c�st for work order 7101236730243: <br />cost <br />43.20 <br />583.20 <br />478.40 <br />2287.80 <br />330.40 <br />5.90 <br />3728.90 <br />--- �'Ze :ii <br />q��.b6 <br />12660.87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.