Laserfiche WebLink
made after review of a completed environmental checklist and other information on file <br />with the lead agency. This information is available to the public on request. This <br />Determination of Non-Significance is specifically conditioned on compliance with the <br />conditions attached hereto which are incc�rporated by reference as if fully set forth herein. <br />This DNS is issued under 197-11-340(2j; the lead agency will not act on this proposal for <br />IS days from the date below. Comments must be submitted by July 11 . 1994 or fifteen <br />(15) days after the date shown on the notarized copy of the notice of posting, whichever <br />date is later. <br />Responsible <br />Official: Paul A. Roberts <br />Title: <br />Address: <br />Planning and Community Development Director <br />2930 Wetmore, Suite 100, Everett, WA 98201 <br />Date: June 24 , 1994 / <br />Signature: ' F • �' �"'� "� • ��" �'=� <br />You may appeal this deternunation to the City Clerk at City Hall, 3002 Wetmore Avenue <br />no later than 10 working days from the date the DN� becomes final (which is after the I S <br />working day comment period) by submitting a written statement requesting an appeal <br />which sets forth the name and address of the person aggrieved, a cleaz and concise <br />statement of the grounds for the appeal, and a fee. You should be prepared to make <br />specific factual objections. Appeal application packets aze available from the Department <br />of Planning/Community *Jevelopment at 2930 Wetmore, Suite 100. <br />Contact Faheem Siddiq to read or ask about the procedures for SEPA appeals. <br />NOTE: A DNS may be withdrawn in the e��ent of significant changes in the proposal, <br />disclosure of new significant information, misrepresentation by the Applicant, <br />or failure to comply with the conditions upon which this Determination of <br />Non-Significance is predicated. <br />INFORMATION FOR DEVELOPER: <br />The following information is provided for the developer's benefit. All comments are <br />preliminary in nature, and aze based upon the preliminary site plan and the •,rdinances in <br />efi'ect at time of submittal for SEPA review. The proposal must comply with all <br />ordinances in effect at the time a complete building permit application is filed, <br />