Laserfiche WebLink
pUBL/� bYO�� <br />August 7, 1996 <br />Dave IvicKay, Chief Project En�;ineer <br />Kimberly-Clazk Corporation <br />P O Box 925 <br />Everett WA 98208 <br />SUBTECT: ElectricalInspections <br />Dear Dave: <br />'I'he purpose of this letter is to s,mmarize the City's understanding of the recent <br />mee6ng we attended to discuss tt�e request relative to the scheduling of electrical <br />inspecdons at the Everett Kimberly-Clark Plant and to respond to that request. <br />The three categories of electrical work discussed were: <br />1. Capital improvement projects contracted to electrical contractors a.�d administered <br />by Jacobs-Serene for Kimberly-Clark. <br />2. Projeots administereci by the Kimberly-Clark Engirieering Department with the <br />wor;c performed by in-house construction staff. <br />3. Projects pe.rformed by Kimbe�ly-Clark maintenance staff operating on in-house <br />work orders. <br />The request was for ins�,ecdons on a six months schedule for all three categories. The <br />basis for this request was work efficiencies and the fact that the supervisors responsible <br />for the work (including the con[racted projects) would lil�:ely be available on site for <br />tnis schedule. <br />CITY OF EVERETT• 3200 Cadar Street • Everett, WA 98201 •(206) 259-8600 • Fax (206) 259-8856 <br />