Laserfiche WebLink
The City's response is as follows: <br />1. Work performed by contractors (category /fl) is to be inspected as the a�ork is <br />completed. Inspections can be requested by calling 259-8810 one day in advance or <br />in some cases the same day (depending on city workload), if requested prior to 830 <br />a.m. This is not meant to preclude inspecting more than one job pe: insepction <br />visit to the site. <br />2. Work performed by Kimberly-Clark employees is to be inspected quarterly. A list <br />of work completed in each quarter ca�: be submittecl with the permit application to <br />this office. An inspection visit will be scheduled with the appropriate Kimberly- <br />Clark staff (this should be included with job list), and the inspection performed. <br />ihis posirion is based primarily on the fact that the City enforces the National <br />Electrical Code, as amended by the State of Washington and as authorized by RCW <br />19.28.210. This secdon of the reviseci code of Washington provides for this contingent <br />upon the city program b.eing one of equal or higher standard to that required by the <br />state. In addition, the City has several other large manufacturing campuses to serve <br />and this program will offer an equitable level of inspec;tion service to similar clients <br />when factoring the amount of work these campuses generate to inspect and the <br />inspection requests of other clients tha� must also be completed. <br />The City will be willing to revisit the inspection frequency of categories #2 and 3, if <br />after a trial period the workload of city staff and the actual number and scope of work <br />performed justifies a revision in this schedule. <br />If you have any quesdons please feel free to call me at 259-8810. <br />Sincer ly, <br />� <br />�,1�la 57L[rL <br />Tim Tyler <br />Building Official <br />cc: Bob Giese, Jacobson Serene <br />Steve Swaller, Pulp Plant Superintendent <br />Bob Jodry, Tissue Plant Superintendent <br />TTjd:M<Kay <br />