Laserfiche WebLink
I. <br />II <br />90-Day Characterization/Final Report <br />City of Everett <br />Fire Station No.5 Gas Tank Spill <br />SEPTEMBER 1991 <br />Table of Contents - <br />Clean-up Action <br />p. Action Description <br />B. Test Results/Conclusions <br />C. Status of Soil Remediation <br />L.U.S.'P. Investigations <br />A. Excavation Pit Testing <br />S. James Property L.E.L. Study <br />C. Rittenhouse-Zeman Vapor Study <br />D. Seacor Boring Study <br />1. Large Equipment on Fire <br />Station Prop�rty <br />2. Small Trailer Drillinq Rig <br />on James Property <br />III. Conclusions <br />(See Letter of Transmittal Dated 10-4-31) <br />Iy, Appendices <br />Letter of Recammendation <br />p, p, Geological Reports by: <br />1. Rittenhouse-Zeman <br />2. Seacor Environmental Engineering <br />B. Test Aesults , <br />1. Excavation Test Results with <br />Sample Plan <br />2, Lead Test Results on Stockpile <br />3. 5oi1 Remediation Test Results <br />4. Petroleum Density Map <br />C. *iiscellaneous <br />1. D.O.E. Checklists (3) <br />2. S.M.E. Tightness Test Report <br />3. N.W. Enviro Services Inc. <br />Disposal Certificate <br />Pa e <br />1 <br />2 <br />2-3 <br />3 <br />3 <br />� <br />4-5 <br />F�: <br />A1 <br />A2 <br />B1 <br />B2 <br />B3 <br />B4 <br />C1 <br />C2 <br />C3 <br />