My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1600 MADISON ST 2016-01-01 MF Import
>
Address Records
>
MADISON ST
>
1600
>
1600 MADISON ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 11:00:36 AM
Creation date
2/17/2017 9:51:17 PM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
1600
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />Test Results/Conclusions: <br />On yay 20, the author took seven soil samples from tne pit <br />wh;n the e�ca�•ations were completed (See the Ma� 21, <br />Sampling Plan in appendi:< B11. _ <br />:11so, the stockpiles in the east parking lot were tested as <br />composite of three sampies on *fay 18, lSee Sample s Comp.�l <br />on Map 18-20, Test Results in Appendix B) and on the <br />completed stockpiles on May 20, (See Sample �8 contam. <br />stock and #9 clean on same lab sheet). <br />The North Creek Analytical Lab test results indicate that <br />the north side of the pit is clean, but that the remaining <br />sides and bottom are still contaminated. It is believed <br />that because the till was so dense, no roots found t� <br />provide channel for ¢asoline migration and no ground water <br />present to carry away the contamination that the majority <br />of the current gas spill, probably 90X of the current <br />spill, has been removed. What remains is the result of the <br />long term spill from approximately .1981 to May 15, 1991. <br />This is supported by the three Metals Analyses dated June <br />1fi, by ivorth Creek Labs which shows presence of lead or the <br />spilling of lead�d gas from this tank. <br />Status of Soil Remediation: <br />On July 19 and 22, the City's Contractor, Demolition Man <br />Inc., meved the stockpiled con�aminated so;l to an <br />abandoned runway at Paine Field and spread the 2i0 yd3 to <br />12 itiches maximum over 6 mil. plastic and between hay <br />bales. The contractor could only till the top 4-5 inches <br />with the small farm tractor tiller but with a few heavy <br />rains the soil has been tested by Environmental Materials <br />Resources and founded to be Class 1 soil here on September <br />11, 1991. Our contractor dumped the soil in n industrial <br />fillsite just south oP the runway about 2,000 feet (See <br />Appendix B for test results and sample plan with the E.M.R. <br />Inc. letter). <br />Stockpiled soils, G-TPH and BTEY soils tests were performed <br />as follows: <br />1. At original stockpile <br />site at Fire Station <br />No. 5, May 18, 1991 <br />2. At Paine Field <br />August 1, 1991 -kl <br />4" deep ma:c. <br />2 <br />Composite <br />Discrete <br />3,500 ppm <br />1.8 pPm <br />
The URL can be used to link to this page
Your browser does not support the video tag.