Laserfiche WebLink
45 degrce angle down from the column base a[ the doorway so as not to undermine <br />the column (oo[ing and base. <br />The base shall then be brought back up with 2" maximum lifts of 7/8"- crusted gravel <br />using a plate compac[or and compacting to 95`% rela[ive density. The City shall <br />provide compaction testing within 24 hours of lhe Contractor's requesL The <br />Con[ractor shall provide the density of [he malerial to the City for approval prior lo <br />calling for ma[erial delivery. Othenvise Ihe Contractor shall have Ihe materiat tested <br />and may have to wait for resulls at his/her own ezpense. <br />On the interior joints use 2'-0" q4 thrcaded pl2in bar at 12" on centers as shown on <br />drawing no. 1 0(1. Use 3/8" asphalt ezpans�on material at each exterior or ouuide <br />join line. The finish of the concrele shall match thc existing finish. The join[ <br />be[ween phase 1 and 2 pours shall be as shown on Drawing no. I of 1. <br />The Contractor shall bid this job based on aclual cubic yards of concrete poured and <br />shail inr,lude all marerials noted here to reconstruct the threshholds in place. Acmal <br />quantities of concrete shall be measured in the field by bo�h the Contractor and Ihe <br />Constniction Manager prior to billing the City. <br />15. Materials: Conerete and steel shall be according lo the Ciry Design and Constn�ction <br />Standards and Specifications as noted above. The pre-casl drainage box shall be by <br />Zurn as noted on Drawing no. I of l. At the downstream end of the dnin wilhin the <br />concrete remova] area lhe Contnetor shall install an oil sepantor ca[ch basin and <br />connec[ the same to the existing 5 1/2" inside diameler concrete pipe. The frame and <br />grate shall be designed to support the 60,000 Ib. ladder lmck. <br />Quote submitled 6y: <br />Ynn[ name <br />S�gnawre <br />Contnctor L�c. no. <br />Pum Name <br />Firm Address <br />Phone number <br />QUOTE TO DO ALL OF THE ABOVE NOTED THR6SHH01_D RtiCONSTUCTION <br />WORK AT FIR6 STATION 5 IS: <br />$ <br />Sales Tax at 7.99'0 = 2 <br />Total Constmction Cost= $ <br />