Laserfiche WebLink
the Facilides O(fice at the above address by Tucsday, November 9, 1993 at 4PM by <br />the City. <br />7. Yrxess for pavment will be initialed upon complelion of all work lo the satis(action of <br />the Construction Manager and upon submittal of contracror's invoice. A purchase <br />order number will be submitled to the ContractoPs office after mtice of low bid is <br />given by the Ciry and the Contractor shall show the purchue order number on the <br />his/her invoice. The project will not be accepled unnl the worA is compiete and all <br />work areas are clean. Final payment shall be made 30 days a(ter the final pour and <br />aRer final acceptance. <br />S. Standards to be adhered to on lhis projecl: <br />Uniform 6uilding Code, 1991 Gdition <br />National Electric Code, 1991 Edition <br />Uniform Plmnbing Code, 1971 Editiun <br />City of Everelt Design and Construction Standards and Specifications, <br />1993 Hdition oblainable a[ the Public Works desk at 3200 Cedar St. <br />Everett, WA. <br />pll city permits, namely a building permit, shall be picked up at the Secvice Center <br />Public Works desk a[ no cos[ and posted at the site by the Contractor. <br />9. Location of site is: <br />Fire Slation no 5 <br />b801 IIeverly 61vd. <br />Evcrett, WA 98203 <br />10. A City business license shall be obtained from City Clerk's Office, first floor, Ciry Hall, <br />3002 Wetmore Avenue, Everett, prior at any work performcu within the City. A <br />small fee is required. <br />I I. Coordination: Contnctor shall coordinate his work with the Fire Department personnel at <br />all times during conslruction and especially prior lo beginning construclion. <br />12. The Contraclor shall pay prevailing wages as required by the State Depardnen[ of � �bor <br />& Industry. <br />13. All of the Contractor's empioyees shail be skilled and with experience. The Contractor <br />shall warraniee his work (or t year (rom the date of final accepinnce. <br />14. The thresFhold replacemen[ shall be done as follows: <br />The base shall be dry or at least firm clay or gravel base. If it is wet, it shall be <br />removed �t the base of cenrer column to a max�mum of 10" inro !he wel soil and cn a <br />