Laserfiche WebLink
Plan Check No. 38344 <br />December 3, 1992 <br />Page Two of Two <br />� <br />In order for the processing of your application to continue, it will be necessazy to provide the <br />Building Division w;th two complete new sets of drawings reflecting the conections requested. <br />Upon resubmittal of the drawings, your application will be given priority and plan review <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure <br />:hat the proposed structure will be constructed in compliance µ�ith all adopted codes. <br />Sincerely, <br />Jeff Heilman <br />Development Technician <br />lH:cg/pivnck(I <br />�'� <br />