My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3121 LOMBARD AVE D 2016-01-01 MF Import
>
Address Records
>
LOMBARD AVE
>
3121
>
3121 LOMBARD AVE D 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2017 10:10:11 AM
Creation date
2/18/2017 10:09:59 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3121
Unit
D
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o �$.i��5-0�-�- <br /> OVER-THE-COUNTER ELECTRICAL PERMIT CHECKLIST FUR RESIDENTIAL SOLAR <br /> PHOTOVGLTAIC SYSTEMS <br /> Controcfoa con apply/ar on Over-The-Counter�OTC)permit where the PV system meets the requlrements fisted <br /> in lhis Checklist and use o templote elettrical drogram provided by Ihe City or otheropp�oved dragram.All <br /> project plons ond supporting dacumentotion must 6e provided on site(or the inspector. <br /> --------TO BE COMPLETEO BY APPLICANT------- <br /> Q Project Information <br /> Property Owner Name: David Bazter <br /> Project Address: 1t21 LomoardAve Parcel N <br /> Ci[y;Evmelt S[BtC:WA ZIP:90201 <br /> Day Phor,e: 425-749-2791 <br /> Contrecmr Name A8R SOLAR CORP <br /> Contrector License p: RSOLAR'903JM <br /> ContrectorDayPhone: ZOfi-707-9937 <br /> ' PV system description Installing a 4.76kW Photovoltaic System on the roof. <br /> (indude manufacturer ���� �tek Energy 280W <br /> and model a ot PV ��� Solectria 5200TL (MIW) <br /> moduies and <br /> inverters): <br /> QDetermine if your project qualifies for an Over-the-Counter electrical permit <br /> Yes No N/A <br /> 1. PV modules,inverters, and combiner boxes are iJentified for use in PV systems, � � <br /> 2. The Inverters are listed and laheled in accordance with UL 1741 and are Iisted for 0✓ � <br /> utility interaction. �IRC M23�2.4] <br /> 3. The AC interconnection point is on the load side of service disconnect.[NEC 690.64�B�� f � <br /> 4. 7he system meets all current NEC,City and Washington Cltles Electrical Code � � <br /> requirements. <br /> 5. For Split•Buss mad�lez the AC interconnection must be one of the six service � � � <br /> disconnects. <br /> 6. Maximum load added to lhe panelboard is based on the ratin�of the panel6oards bus/main OCPD <br /> combination in accordance with NEC 705.12�D��2�(3)(b),and i5limited to(check cambination ihat <br /> applies): <br /> �225 amp bus/200 amp main OCPD-13,440 AC wat[5,maximum 70 amp inverter OCPD. <br /> ❑225 amp bus/225 amp mafn OCPD- 8,690 AC watts,maxlmum 45 amp Inverter OCPO. <br /> . ' 8200 amp hus/200 amp main OCPD- 7,860 ACwatls,ma■imum 40 amp inverterOCPD. <br /> ❑150 amp hus/150 amp main OCPD- 5,760 AC watts,maximum 30 amp inverter OCPD. <br /> 0325 amp bus1125 amp main OCPD- 4,800 ACwatts,ma�imum 25 amp inverterOCPD. � <br /> ❑125 amp 6us/100 amp main OCPO- 9,600 AC watts,maximum 50 amp inverter OCPO. <br /> � <br /> i. - " -- -- - ' �---- � — ' - -- ' --�- -- '- - - --�-- - - . _ . . _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.