Laserfiche WebLink
Geotechnicnl Lnginecring Report <br /> i�o��S��,E i to�� <br /> December 5,2004 <br /> RMI File No. 21704 <br /> Pagc 14 <br /> of impe:meable soil pluced over plas[ic sheeting or building paper [o minimize surface water or <br /> (ines migration into the footing drain. Poating drains should discharge into tighllines Icading to <br /> an appropriate collection and discharge puint with convenient cleanouts to prolong the useful lite <br /> d the drains. Roof drnins should not bc cunncctcd to •vall or f�ootin�:dr.+ins. <br /> Pavements <br /> Roadway subgrade prepamtion and structural tilling, wherc rcquired, shtiuld be completed as <br /> rccommended in the Site Preparatiun and Gr•rding and Structural Fill subsections of this <br /> rcpert. The subgrade should be proorrolled with a heavy, rubber-tired piece of equipn:ent. to <br /> iden[iTy soft or yiclding arws that requirc repair. We shoidd be retained to obscrvc the <br /> prooGolling and recommend rzpairs priur tu placement of thc asphalt or hard surfac�s. <br /> USC Or THIS REPOR"T <br /> This report remains the property of RMI Associates, Ll. .and has heen prepared for[he Housing <br /> Hope and their agents for use in the planning and desien of this project on this site only. The ' <br /> scopc of our work does not include scrvices rclated to constructiun safery precautions and our ' <br /> recommeuaations arc not intended to direct the contractors' methods, techniques, sequences, or <br /> proccdures, except as specitically described in our repurt for consideration in design. There are <br /> pussible variations in subsurface conditions 6ehvecn the exploratians and also with time. Our <br /> rcport, conclusions-, and inteipretutions should not be constru:d as a warranty of subsurf�ce <br /> conditions. A contingency lor unanticipated conditions should bc inc!udcd in the budget and <br /> schedule. <br /> RMI should be retained to provide monitoring and consultation services during construction to <br /> contirm Ihzt the co��ditions encomitered are consistent�' ith those indicated by the explorations,to <br /> provide recommenda[ions for design changes should d�c conditions revealed durng the «�ork <br /> differ tiom those an[icipated, and to evaluate whether or not earth�vork and foundation <br /> installation activities comply wiUi convact plans and specitications. W� shuuld be contacted a <br /> minimum of two weeks prior to construction activities and could�ttend pre-constru.tion meetings <br /> if requested. <br /> RMI ASSOCIATES, LTD. <br />