Laserfiche WebLink
E'I'ORMWATC•R SITF PL:1N DECEh1BER 19.2005 <br /> N[W C�N'I'URl'VILI.AGG PAGE 5 <br /> III: OFFSITE ANALYSIS <br /> DO�VNSTREA�i INVESTIGATIQN <br /> � Infiltratiun is proposed for the redevelopmcnt area. As such, no runoff is expected io leave the <br /> that arca.No runoff will be added to the downstrcam system and no speciti: off-site analysis was <br /> performcd. <br /> An overflow is provided from thc intiltration system to the existing storm drainaee system tor the <br /> southeast multi-family devclopmcnt. "I'his will allow a safc ovcrflow unde; unGsually intensc <br /> storms. The City of Evcrett drainage inventory maps show the existing srorm system and the off- <br /> site connection. A copy of d�is map is included for refcrence in Appendix A. <br /> POTE:V'CIAL PROBLEMS AND DOWNSTREAM h11TIGATION <br /> r W iP.i no additional runoff being directed to the downstream system, no mitigatioin ;s propused <br /> bcyond thc usc of inYiltraton as a stormwatcr quartity control. <br /> There is an existing catchbasin diat collects runoff from die northeast multi-family structure. This <br /> catchbasin was insta.�ed many ycars ago. apparenHy as a dry well. The City of Everett has noted <br /> tnat this system no longcr functions adequately. Given the local topography,the catchbasin lies at <br /> a lower elevation Uian any of the other on-site storm systems and canr.ot be raised due ro the <br /> cxisting strucWre and parking :re�i that will remain. �ye propose to install a new intiltration <br /> system to the wcst ot'dtis structure to handle �vnof£ The desibm of this system is detailed under <br /> the ANALYSIS AND DESIGN OF RUNOFF CONTROL BMP'S section latcr in this repoR. <br /> i <br /> � <br /> � <br /> J?Nous�ng noce`oroaanap 6e�eu Hcas�rg G�255'o�a�na�e:sSP Hex Ce•nury OOG DWH/Sfrt1 <br /> I <br /> � <br />