Laserfiche WebLink
I STORMWAT[R SITE PLAN DECE�16[R 19, ?005 <br /> NE\V CEN"IURY VII.LAGf PAGE 6 <br /> � <br /> IV: ANALYSIS AND DESIGN OF EROSION AND SEDIMENT <br /> CON r k�L BMP'S <br /> TE�IPOi2ARY COVER B11P'S. <br /> � BMP G1.10, Temporary Secding of Strippcd Arcas: <br /> Temporary seeding of topsoil stockpiles and adicr stripped arcas will be necessary during <br /> construction. Thc proposed secd mix is given on the construction plans and wnfenns to <br /> f the City of Everctt Standard. <br /> I <br /> BMP ELlS, Mulching and Matting: <br /> � The exposed surfaces will Ue hydrosceded with an crosion conirol mixturc. This wi11 <br /> include a wood tiber mulch. On steep slopes a tackitier or liquid soil bonding agent may <br /> be added. <br /> BMP E1.20, Clear Plastic Covcring: <br /> This invoh�cs covcring a barc arca with dcar plastic �vhich protccts thc immediatc arca to <br /> thc detriment of downstrenm arcas. This BMP will only bc used on this site if rcquircd for <br /> immcdiate sitc protcction. <br /> BMP E1.7_5, PrescrvingNatural Vcgctation: <br /> Given the urbau nature of thc site, tliis BMP will have little impact on the site. <br /> E3MP E13:i, Pemianent Sceding and Planting: <br /> The site will be seeded after cach segmcnt of grading has been completed. A final <br /> landscaping plan will bc prcpared tirr dic sitc and will be implemcntcd aftcr the tinal <br /> � construction. <br /> � BMP E1.45, Topsoiling: <br /> � The native top soil will be stripped und stockpiled. AVastc areas will be found for the sod <br /> or it «�Ilt bc remo��cd Gom thc site. Remaining topsoil ���ill be uscd to cocer the sub�adc <br /> of��egetat�d arcas. <br /> I J.Mccsi��gMeeoAreaanayEverenHces�ng0a�256�Drainaye'.55PNv.vCenWry.WG D�VHISf1f1 <br />