My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2507 HOWARD AVE 2016-01-01 MF Import
>
Address Records
>
HOWARD AVE
>
2507
>
2507 HOWARD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2017 10:32:51 AM
Creation date
2/18/2017 1:59:24 PM
Metadata
Fields
Template:
Address Document
Street Name
HOWARD AVE
Street Number
2507
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gcolrchnical ling�nccrine Ncport <br /> Flousine liopc <br /> December 5,2D04 <br /> RMI �ile No. 21704 <br /> Page 2 <br /> 6615 Broad�vay contains a 4-piex with associated p�rking to the west and u la�vn to lhe rorth. <br /> Wc undcrstand thesc cxisting structures on both lots will bc demalishcd prior to construction. An <br /> oil tank has becn located a[the easlem CIl(I Of LI1C CXISLIII�,�l`Sl�l'i1CC. <br /> 11'e do not have plans of the proposed sit� improvemenU, but undcrstand underground parking <br /> may be considered for onu or botl� of the lots. We also understand [he ncw buildings ��'ill bc <br /> multiplexes and lhat on-,ite infiltration of stonn water is also planned. Pinnl dcsigns �re not <br /> known at this timc. <br /> Based on site grndes, we c�p�ct minimum cuts of S Cect if undcrgruun� parking is planned. �Ve <br /> are not aware of any nreas requiring substantial structural fill. Specific design of the buildings, <br /> roadways, utilitics, and th: dctention arca systems were not known u[Ihe time of this report. <br /> scorr <br /> The purpose of this study is to evaluate the subsurface soils and provide reconunendations for site <br /> devclopment. Specifically, our scope of services includcs thc following: <br /> I. Review available soils and geologic maps of the area. <br /> 3. Explore [he subsurface conditions with geotechnical tcst pits. \1'e will <br /> subcontrac[thc backhoc. <br /> 3. Provide recommendalions for site prcp:�ra[ion and gradine, includine structural <br /> fill materiu! and placement. <br /> �3. Providc rccommenda[ions for foundation support. <br /> 5. Provide recommendations for retaining walls, including lateral pressures. <br /> 6. Provide recommendations for site drainage mid erosion control. <br /> 7. Prepare a written report documentim� our obsenatiuns, cunclusions and <br /> rccommendations. <br /> 8. The capabilitv of the onsite soils to provide intiltration will also b� assessed <br /> using Lhe Textural Clnssification Method. Later you requested Ihat we provide <br /> design infiltration rates in compGuncc with the 2001 Depnrtment of Ecolo�ry <br /> �immal. <br /> RMf ASSOCIATES, LTD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.