My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1118 HOYT AVE 2016-01-01 MF Import
>
Address Records
>
HOYT AVE
>
1118
>
1118 HOYT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2017 2:25:10 PM
Creation date
2/18/2017 2:24:52 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1118
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r� �-� � � <br /> s �,- ,:� �, ��fi � r <br /> I '�L �-' '� u � <br /> I <br /> !j OEC 3 0 ?OOA <br /> `-����i' c)F L;'1.ttLI�. <br /> �'ermii ServicEs <br /> 12-09-2004 <br /> City Planning Department <br /> Cedar Si <br /> Everett, WA98201 <br /> Attention; Jeff lieilman <br /> Development Technician <br /> Refcrence to; Lee Project <br /> I I 18 Hoyt A V Fi <br /> C0411-0�? <br /> You sent us a letter with quite a list ot items lo altend lo. <br /> I'his is our explanation of remedy to your list. <br /> -- I. This was accomplished by redrawin�,this scction to sho�v the requestcd cross <br /> section. See Cross section `A", Page 3-5. <br /> -- 2. 'fhe old deck was infested with carpenter Ants and was imstable. It was � <br /> removed ro help Eliminated the pest problem and was replaced �vit;i a slab, ' <br /> thus, eliminating concern for pest. Orkin is employed to treat the property and <br /> make monthly inspections . See page 2-5. Cross section "A". <br /> -i 3. Sce Gngineer letter(Structural Design Associates), and the existing foundation <br /> �vill be drilled to a depth of 12 inches to accept #d rebar and will be glued <br /> using epoxy cement.. <br /> �- �1. �Ve will fullow the State cod�. and have indicated the required levels on page <br /> 2-5 Cress section "A", and 3-5 Goss section ".A". <br /> : 5. Revised site plan is as indicated on page 1-5, Site Plan. <br /> I <br /> — 5. See Structural Engineer changes. Page S I-0 Structural Notes. <br /> i See page 2-5, and note addition of nail plares as suggested by d Designer. <br /> ('ros; Section "A". <br /> 1 <br /> '1_� <br />
The URL can be used to link to this page
Your browser does not support the video tag.