My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1118 HOYT AVE 2016-01-01 MF Import
>
Address Records
>
HOYT AVE
>
1118
>
1118 HOYT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2017 2:25:10 PM
Creation date
2/18/2017 2:24:52 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1118
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-;- 8. Thc windows installed and to be installed mect or excecd �VSEC 2003 L-d. <br /> See 2-5 Pirst Ploor windo�v and door schedule <br /> �, �). See the Y.itchen Main Floor Plan page 2-5. <br /> _:, 10. Those that are to be replacements are: P�ee 2-> .�nd �-5 Kitclien ?�1ain Floor <br /> Plan. <br /> Kitchen Sink <br /> Dishwasher hot water e��I c <br /> Refrigerator wld water <br /> Those that will replace fixtures in the ba�c�ncnt are: Page I-? I���r ha�emem <br /> Shower <br /> \L`ash [3asin <br /> Commode <br /> Clothes washer <br /> To be new installation is; <br /> Vegetable sink (Kitchen lsland) <br /> - I I. I�inished elevations; see page 4-� <br /> � 12. SafetV Glass as required by code has bcen installcd. b1cet 303.8 IRC 2003 <br /> Code requirements. See page Z-5 M3in �loor Plan. <br /> 13. Oun c�ating system will be a gas fired hot water system. Thc boiler will bc <br /> located in the utility room and hot water will be niped to the main body of our <br /> basement and to the entirc main iloor. <br /> Special tubing of special type to be installed in the 6lsement cement floor. See page <br /> l-5. 7'ubing specification ASTM � 87G-877 02.10.15. <br /> The main floor has tubing that will be installed between the joists. All areas of the <br /> main floor�vill be involved using tubing spec�t ['SCSSDSAS"CM P 128T14S G. Sec <br /> pa�e I-5 for detaiL This piping is covered �+�ith "ReBerctix" Spec. ST 1602?. <br /> Additional insulation is added to meet and exceed WA State requirements. <br /> The Water boiler will be; Polaris, 50 �allons, Model PGI 0-50-130-2NV, 13Q000 <br /> l3TU. The system has a pump and 2 manifolds 1'or distribution ef the hot watcr. The <br /> plumbing to, and including the manifolds will be copper and brass. The manifold is <br /> cast brass. See Page 1-5, Slab cuiaway and First Floor cutaway. <br /> 14. See page 2-5 nlain Floor Plan and pa�.:e 3-5 Truss to Eoundation pian. <br /> I 5. See page I-5. 13asement Floor Plan. <br /> Ib �m,inccrs Icttcr <br /> �� <br /> �' <br />
The URL can be used to link to this page
Your browser does not support the video tag.