Laserfiche WebLink
Ja_COBSON-ERICKSON-HOBBLE., lNC. <br />ENGINEERS ARCHITEGTS PLANNERS <br />6:35EWtiC�CUiL�IY� • $EF'TLE\'::SH"...TCti9C'�O� • l:�+IG2-.�NLJ <br />DecFmber 4, 19i0 <br />Howard S. Lease Construction Co. <br />4330 - 14IIth f�. E. <br />Redmond, Washinqton 98G52 <br />Attenticn: Mr. Charles E. Tobin <br />Re: Selr-ParE:ing Facility i, Arcade <br />City of Everett <br />Gentl e�:,en: <br />7his is to confirm cu� telephone conversation yesterday morning re9arair�g <br />the column footing elevations at ti�e southo-rest corner of the Everett parkin9 <br />facility. The top of footing elevations zt the grid lines, G-22, H-22, and <br />J-17 through J-21, is shoti�m on the Contract Drawing t�o. S-2 as 196.00 feet. <br />This elevation can be raised up to 200,00 feet, provided that undisturbed <br />firn� soil is met at such elevations during excavation. These footings nu�t <br />be inspected by the Uames & N�oore field engineer and approved for the design <br />bearing capacity of 4 tsf. <br />The credit +a the Oti+ner for the reduction in depth of excavation ana the <br />length �t the cast-in-�lace concrete pilasters wi11 be worked out in a <br />su6seq�.�nt Ch�nge Order. Thank you. <br />Very truly yours, <br />,IACOBSOh�-ERICKSOt�-NOGBLE, ICC. <br />�L1� =::.L/�-� � - �,� <br />Ahmed M. Jaddi <br />Project Manager <br />A�•!J / dc <br />xc Nf•1r. Art Lyon, City of Everett <br />City Engineer's Office <br />t4r. Tom Capell, On-site Prcject Represen�ative <br />hir. Donald E. Nelson, Dames & I'.00re <br />