Laserfiche WebLink
EV2P��i, �G�.`'�11'�:lll� ,'-uCl�ii.,f <br />Job rlo. 6610 <br />Job t42eting - Decerher :;, iJ7� fro--, °:30 p.r,. to d:00 p,m, in C�r..ractor's uifice <br />i,iiendir•;: '+ Art Lyon t4r, Chuck Tobin� hir. 6ob Cassity, Fir. T��m Capell, anJ <br />tir. nmea addi <br />Fi�•� f�ose cabinets are to be surface mounted outside tne stairs. <br />Tori Capell is to verify tiie locations �•�ith tne City Fire �>part _:. <br />2. "',tiiCe-Lite" electric ligiit fixture is not yet accepted. �!r•. Ci���c <br />Tebin is to furnish prices for fiolophane and Appleten fixtures. <br />?. Ccr,struction joints in the deck slab can b= located over tn2 pr•_- <br />s�ressed beam. Such joints rrust be locate� �:ithin 12 inciies or" -_ <br />cer.ter of the beam. <br />+. Tflt SLII'YUPS lIl Lh2 pi•estresse' ��di:S� d5 Si10'rlfl Ofl �OfICI'dCt !:t'��.,1��.. <br />Sheet 5-13, are to be "field bent". Tiie Contractor nay si�op b_,. <br />these stirru�s after tiie forms are stripped. Tiiis eiill allon co - <br />pensation for the camber in t,�.e �eam. These stirrups may also be <br />siiop benC before being placed in the forns, provided cau�ion is ta�._: <br />to have the stirrups project r.' above the ;restressed bean `lang� <br />as indicated in Detail 1/5-13. Tampering o-�itn these stirrups to �:'= <br />field conditions �•rill r,ot be accepted. <br />�. SiCewalk scoring, as sho�.m on S^=et A-�, is preferred, �ruvidec '._ �s <br />acceptable to ;he City. Scorina at a`ive-foot ��odule may �e �n <br />alternate choice. 61r. Tom Capell is to veri,`y tha City standar�l,. <br />6. The exposed electric conduit at tiie socth�•�est corner is a high- <br />voltage line. The Contractor �ras reninced to take the necessary <br />precautiors for the protection c` this corduit. His att2ntion ,c.- <br />also dra�m to the necessity oi protecting th� street light :cl=_s <br />at tnis corner �,,here the pole fcotings are exposed. <br />7. Th2 existing retaining :�all at tne southwest corner inter�eres ��ritn <br />the trees and future installation o` the cable. F?r. Tom Capell .iiil <br />investigate an optimum sol�tion *.o minimize any interference. <br />8. Tne Engineer is to submit a for*nal request for tf�e de�uction to i. <br />a110wed in the Contract amount for tt�e elimination of shoring or <br />the caisson bells on grid lines 13 and 15. <br />9. The Contractor is to Vrork out deductions r'or tne changes in footing <br />elevations on grid lines E, ,] and 22 and su��n't these to iir. Tcm <br />Cape?1 for :_rifi=atio��. <br />